IAC Assessment: UF0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Pre-Stressed Concrete Pipes
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 1,742,400
Annual Production 4,000 Thousand Feet
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,662 992,673 kWh $0.04
Electricity Demand $34,899 4,013 kW-months/year $8.70
Natural Gas $23,549 4,600 MMBtu $5.12
TOTAL ENERGY COSTS $97,110
RECOMMENDED SAVINGS* $107,059 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,622
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,768
Cost:
$50
- - - - - - - - $4,768 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,768
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$151
Cost:
$2,105
$73 1,758 $78 1 - - - - - - $73
1,758
kWh
$78
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$107
Cost:
$275
$107 2,638 - - - - - - - - $107
2,638
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$2,340
Cost:
$11,000
- - - - $2,340 435 - - - - -
-
kWh
-
-
kW-months/year
$2,340
435
MMBtu
-
-
lb
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$142
Cost:
$378
$142 3,517 - - - - - - - - $142
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,454
Cost:
$1,865
$1,218 29,601 $1,236 13 - - - - - - $1,218
29,601
kWh
$1,236
13
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$57,590
Cost:
-
- - - - - - $57,590 8,697,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$57,590
8,697,000
lb
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$20,000
Cost:
-
- - - - - - $20,000 88,184,904 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,000
88,184,904
lb
-
-
$
09: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$19,507
Cost:
$8,590
- - - - - - - - $19,507 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$19,507
-
$
TOTAL RECOMMENDED Savings:
$107,059
Cost:
$24,263
$1,540 37,514 $1,314 14 $2,340 435 $77,590 96,881,904 $24,275 - $1,540
37,514
kWh
$1,314
14
kW-months/year
$2,340
435
MMBtu
$77,590
96,881,904
lb
$24,275
-
$
TOTAL IMPLEMENTED Savings:
$27,622
Cost:
$4,673
$1,540 37,514 $1,314 14 - - $20,000 88,184,904 $4,768 - $1,540
37,514
kWh
$1,314
14
kW-months/year
-
-
MMBtu
$20,000
88,184,904
lb
$4,768
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes