IAC logo
IAC Assessment: UF0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Metal Castings
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 73,000
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,245 1,585,287 kWh $0.09
Natural Gas $15,912 1,961 MMBtu $8.11
TOTAL ENERGY COSTS $159,157
RECOMMENDED SAVINGS* $226,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $226,828
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,688
Cost:
$862
$1,688 18,757 - - - - - - $1,688
18,757
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.8112 COMBINE UTILITY METERS Savings:
$40,200
Cost:
$4,100
- - - - - - $40,200 - -
-
kWh
-
-
MMBtu
-
-
lb
$40,200
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,206
Cost:
$871
$2,206 24,326 - - - - - - $2,206
24,326
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$349
Cost:
-
$349 3,810 - - - - - - $349
3,810
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$962
Cost:
$220
$962 10,844 - - - - - - $962
10,844
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$511
Cost:
-
- - - - $511 - - - -
-
kWh
-
-
MMBtu
$511
-
lb
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,500
Cost:
$8,000
- - - - $2,500 - - - -
-
kWh
-
-
MMBtu
$2,500
-
lb
-
-
$
08: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$178,412
Cost:
$250,000
- - $178,412 19,600 - - - - -
-
kWh
$178,412
19,600
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$226,828
Cost:
$264,053
$5,205 57,737 $178,412 19,600 $3,011 - $40,200 - $5,205
57,737
kWh
$178,412
19,600
MMBtu
$3,011
-
lb
$40,200
-
$
TOTAL IMPLEMENTED Savings:
$226,828
Cost:
$264,053
$5,205 57,737 $178,412 19,600 $3,011 - $40,200 - $5,205
57,737
kWh
$178,412
19,600
MMBtu
$3,011
-
lb
$40,200
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes