IAC logo
IAC Assessment: UF0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Water Meters
NAICS n/a
SIC 3824 - Fluid Meters And Counting Devices
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 90,000
Annual Production 600,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,178 2,373,095 kWh $0.06
Electricity Demand $41,686 7,006 kW-months/year $5.95
TOTAL ENERGY COSTS $188,864
RECOMMENDED SAVINGS* $102,533 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,382
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,865
Cost:
$2,831
$5,061 81,770 $804 11 - - - - $5,061
81,770
kWh
$804
11
kW-months/year
-
-
$
-
-
$
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$5,242
Cost:
$12,014
$5,242 65,651 - - - - - - $5,242
65,651
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,732
Cost:
$7,400
$1,204 19,343 $528 7 - - - - $1,204
19,343
kWh
$528
7
kW-months/year
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,323
Cost:
$50
- - - - $10,323 - - - -
-
kWh
-
-
kW-months/year
$10,323
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,597
Cost:
$460
$2,645 33,118 - - $(-48) - - - $2,645
33,118
kWh
-
-
kW-months/year
$(-48)
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,740
Cost:
-
$2,740 34,291 - - - - - - $2,740
34,291
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$835
Cost:
$1,500
$835 13,482 - - - - - - $835
13,482
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$481
Cost:
$834
$481 7,620 - - - - - - $481
7,620
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$704
Cost:
$600
$230 3,810 $30 1 $444 - - - $230
3,810
kWh
$30
1
kW-months/year
$444
-
$
-
-
$
10: 3.4155 METER WASTE WATER Savings:
$2,940
Cost:
$1,500
- - - - $2,940 - - - -
-
kWh
-
-
kW-months/year
$2,940
-
$
-
-
$
11: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,874
Cost:
$3,721
- - - - $1,874 - - - -
-
kWh
-
-
kW-months/year
$1,874
-
$
-
-
$
12: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$67,200
Cost:
$84,000
- - - - - - $67,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$67,200
-
$
TOTAL RECOMMENDED Savings:
$102,533
Cost:
$114,910
$18,438 259,085 $1,362 19 $15,533 - $67,200 - $18,438
259,085
kWh
$1,362
19
kW-months/year
$15,533
-
$
$67,200
-
$
TOTAL IMPLEMENTED Savings:
$27,382
Cost:
$13,675
$12,361 179,952 $1,362 19 $13,659 - - - $12,361
179,952
kWh
$1,362
19
kW-months/year
$13,659
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product