IAC logo
IAC Assessment: UF0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Treated Metal Parts
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 11,450
Annual Production 20,075 Units
Production Hrs. Annual 6,708
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,237 1,252,000 kWh $0.04
Electricity Demand $37,132 5,122 kW-months/year $7.25
Natural Gas $23,401 9,450 MMBtu $2.48
Other Energy $27,240 1,141 MMBtu $23.87
TOTAL ENERGY COSTS $140,010
RECOMMENDED SAVINGS* $38,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,014
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$9,184
Cost:
$50
- - - - - - $9,184 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,184
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,027
Cost:
$2,302
$833 17,711 $194 2 - - - - $833
17,711
kWh
$194
2
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,439
Cost:
-
$1,439 25,698 - - - - - - $1,439
25,698
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,553
Cost:
$220
$2,553 31,767 - - - - - - $2,553
31,767
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,200
Cost:
$6,910
- - - - $8,200 3,283 - - -
-
kWh
-
-
kW-months/year
$8,200
3,283
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,725
Cost:
$14,788
$4,725 76,496 - - - - - - $4,725
76,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$1,180
Cost:
$5,321
$1,180 15,424 - - - - - - $1,180
15,424
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$5,285
Cost:
$75
$5,285 65,253 - - - - - - $5,285
65,253
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,210
Cost:
$7,000
- - - - - - $1,210 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,210
-
$
10: 3.7141 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM Savings:
$282
Cost:
$260
$257 5,487 $25 1 - - - - $257
5,487
kWh
$25
1
kW-months/year
-
-
MMBtu
-
-
$
11: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$2,958
Cost:
$6,000
$869 18,469 $2,089 21 - - - - $869
18,469
kWh
$2,089
21
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,043
Cost:
$42,926
$17,141 256,305 $2,308 24 $8,200 3,283 $10,394 - $17,141
256,305
kWh
$2,308
24
kW-months/year
$8,200
3,283
MMBtu
$10,394
-
$
TOTAL IMPLEMENTED Savings:
$26,014
Cost:
$23,695
$14,522 215,183 $2,308 24 - - $9,184 - $14,522
215,183
kWh
$2,308
24
kW-months/year
-
-
MMBtu
$9,184
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes