IAC logo
IAC Assessment: UF0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Truck Mounted Sewer and Catch basin Cleaning Equipment
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 64,000
Annual Production 370 Units
Production Hrs. Annual 5,928
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,920 3,051,583 kWh $0.06
Electricity Demand $35,572 7,593 kW-months/year $4.68
Fuel Oil #2 $(-2,760) 84 MMBtu $(-32.86)
TOTAL ENERGY COSTS $206,732
RECOMMENDED SAVINGS* $279,832 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $213,696
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$4,038
Cost:
$4,300
$4,038 67,409 - - - - - - - - $4,038
67,409
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,164
Cost:
$3,861
$1,591 39,859 $573 7 - - - - - - $1,591
39,859
kWh
$573
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,334
Cost:
$30,000
$6,334 105,510 - - - - - - - - $6,334
105,510
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$7,800
Cost:
$25,000
$4,985 124,560 $3,790 56 - - $(-975) - - - $4,985
124,560
kWh
$3,790
56
kW-months/year
-
-
MMBtu
$(-975)
-
$
-
-
%
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,753
Cost:
$1,025
$1,753 43,962 - - - - - - - - $1,753
43,962
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
06: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$1,578
Cost:
$252
$1,578 39,566 - - - - - - - - $1,578
39,566
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$36,614
Cost:
$72,000
- - - - $(-2,760) 84 $39,374 - - - -
-
kWh
-
-
kW-months/year
$(-2,760)
84
MMBtu
$39,374
-
$
-
-
%
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,648
Cost:
$50
- - - - - - $11,648 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,648
-
$
-
-
%
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,233
Cost:
$8,000
- - - - - - $15,233 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,233
-
$
-
-
%
10: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$27,670
Cost:
$1,800
- - - - - - $27,670 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,670
-
$
-
-
%
11: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$165,000
Cost:
$42,000
- - - - - - - - $165,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$165,000
-
%
TOTAL RECOMMENDED Savings:
$279,832
Cost:
$188,288
$20,279 420,866 $4,363 63 $(-2,760) 84 $92,950 - $165,000 - $20,279
420,866
kWh
$4,363
63
kW-months/year
$(-2,760)
84
MMBtu
$92,950
-
$
$165,000
-
%
TOTAL IMPLEMENTED Savings:
$213,696
Cost:
$69,102
$6,563 164,126 $3,790 56 - - $38,343 - $165,000 - $6,563
164,126
kWh
$3,790
56
kW-months/year
-
-
MMBtu
$38,343
-
$
$165,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Increase in Production