IAC logo
IAC Assessment: UF0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Pharmaceutical Intermediates
NAICS n/a
SIC 2865 - Cyclic Crudes And Intermediates
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Thousand Gallons
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,340 988,313 kWh $0.06
Electricity Demand $31,013 3,603 kW-months/year $8.61
Electricity Fees $16,001 - $ -
Natural Gas $28,468 2,641 MMBtu $10.78
TOTAL ENERGY COSTS $133,822
RECOMMENDED SAVINGS* $48,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,590
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$705
Cost:
$785
$385 6,523 $320 3 - - - - $385
6,523
kWh
$320
3
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$516
Cost:
$500
$516 6,266 - - - - - - $516
6,266
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,501
Cost:
$8,123
$3,643 61,747 $858 8 - - - - $3,643
61,747
kWh
$858
8
kW-months/year
-
-
MMBtu
-
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$439
Cost:
$450
$439 7,437 - - - - - - $439
7,437
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$390
Cost:
$91
- - - - $390 36 - - -
-
kWh
-
-
kW-months/year
$390
36
MMBtu
-
-
$
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,194
Cost:
$5,000
- - - - $1,194 78 - - -
-
kWh
-
-
kW-months/year
$1,194
78
MMBtu
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,036
Cost:
$50
- - - - - - $5,036 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,036
-
$
08: 2.2111 INSTALL STEAM TRAP Savings:
$14,111
Cost:
$1,200
$14,111 81,973 - - - - - - $14,111
81,973
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$21,330
Cost:
$45,000
- - - - - - $21,330 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,330
-
$
TOTAL RECOMMENDED Savings:
$48,222
Cost:
$61,199
$19,094 163,946 $1,178 11 $1,584 114 $26,366 - $19,094
163,946
kWh
$1,178
11
kW-months/year
$1,584
114
MMBtu
$26,366
-
$
TOTAL IMPLEMENTED Savings:
$37,590
Cost:
$52,150
$15,066 95,676 - - $1,194 78 $21,330 - $15,066
95,676
kWh
-
-
kW-months/year
$1,194
78
MMBtu
$21,330
-
$