IAC logo
IAC Assessment: UF0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product MultiWall Paper Shipping Bags
NAICS n/a
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 174,000
Annual Production 180,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,704 8,970,172 kWh $0.02
Electricity Demand $146,263 15,880 kW-months/year $9.21
Electricity Fees $9,184 - $ -
Natural Gas $89,909 8,234 MMBtu $10.92
TOTAL ENERGY COSTS $446,660
RECOMMENDED SAVINGS* $650,050 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,315
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,104
Cost:
-
$10,140 252,593 - - - - - - $(-36) - - - $10,140
252,593
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-36)
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,130
Cost:
-
$3,052 145,336 $2,078 19 - - - - - - - - $3,052
145,336
kWh
$2,078
19
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,261
Cost:
-
$232 11,038 $139 1 - - - - - - $890 - $232
11,038
kWh
$139
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$890
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$20,383
Cost:
-
$7,705 366,912 $12,378 112 - - - - $300 - - - $7,705
366,912
kWh
$12,378
112
kW-months/year
-
-
MMBtu
-
-
lb
$300
-
$
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,497
Cost:
-
$1,872 89,166 - - - - - - - - $625 - $1,872
89,166
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$625
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$15,737
Cost:
-
$15,737 749,381 - - - - - - - - - - $15,737
749,381
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$14,700
Cost:
-
$9,183 437,300 $5,517 50 - - - - - - - - $9,183
437,300
kWh
$5,517
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$8,088
Cost:
-
$5,049 240,408 $3,039 28 - - - - - - - - $5,049
240,408
kWh
$3,039
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,962
Cost:
-
$3,962 99,056 - - - - - - - - - - $3,962
99,056
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,315
Cost:
-
$1,315 62,596 - - - - - - - - - - $1,315
62,596
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
11: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,712
Cost:
-
- - - - $2,712 300 - - - - - - -
-
kWh
-
-
kW-months/year
$2,712
300
MMBtu
-
-
lb
-
-
$
-
-
$
12: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$9,600
Cost:
-
- - - - - - $9,600 2,400,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,600
2,400,000
lb
-
-
$
-
-
$
13: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$7,281
Cost:
-
$7,281 194,375 - - - - - - - - - - $7,281
194,375
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
14: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$7,280
Cost:
-
- - - - - - - - $7,280 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$7,280
-
$
-
-
$
15: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$540,000
Cost:
-
- - - - - - - - $540,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$540,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$650,050
Cost:
-
$65,528 2,648,161 $23,151 210 $2,712 300 $9,600 2,400,000 $547,544 - $1,515 - $65,528
2,648,161
kWh
$23,151
210
kW-months/year
$2,712
300
MMBtu
$9,600
2,400,000
lb
$547,544
-
$
$1,515
-
$
TOTAL IMPLEMENTED Savings:
$33,315
Cost:
-
$25,522 832,712 $5,117 47 $2,712 300 - - $(-36) - - - $25,522
832,712
kWh
$5,117
47
kW-months/year
$2,712
300
MMBtu
-
-
lb
$(-36)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost