IAC logo
IAC Assessment: UF0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Acoustical Ceiling Tiles
NAICS n/a
SIC 3296 - Mineral Wool
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 1,132,560
Annual Production 150,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $914,469 37,784,975 kWh $0.02
Electricity Demand $658,925 71,520 kW-months/year $9.21
Natural Gas $2,818,245 667,601 MMBtu $4.22
TOTAL ENERGY COSTS $4,392,321
RECOMMENDED SAVINGS* $648,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $248,075
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$46,074
Cost:
$2,910
$21,543 797,888 $23,904 274 - - - - $627 - $21,543
797,888
kWh
$23,904
274
kW-months/year
-
-
MMBtu
-
-
lb
$627
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$190,612
Cost:
$67,472
$148,650 5,505,539 $41,962 481 - - - - - - $148,650
5,505,539
kWh
$41,962
481
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$703
Cost:
$621
$703 15,614 - - - - - - - - $703
15,614
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$56,760
Cost:
$143,877
$41,493 1,536,765 $15,267 175 - - - - - - $41,493
1,536,765
kWh
$15,267
175
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,545
Cost:
$36,000
- - - - - - - - $19,545 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$19,545
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$26,575
Cost:
$46,800
$22,055 816,870 $4,520 52 - - - - - - $22,055
816,870
kWh
$4,520
52
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$191,133
Cost:
$282,000
- - - - $191,133 45,292 - - - - -
-
kWh
-
-
kW-months/year
$191,133
45,292
MMBtu
-
-
lb
-
-
$
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$5,102
Cost:
$20,000
$5,102 188,963 - - - - - - - - $5,102
188,963
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$682
Cost:
$1,895
- - - - - - $682 397 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$682
397
lb
-
-
$
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$111,602
Cost:
$1,600
$81,504 3,018,656 $30,098 345 - - - - - - $81,504
3,018,656
kWh
$30,098
345
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$648,788
Cost:
$603,175
$321,050 11,880,295 $115,751 1,327 $191,133 45,292 $682 397 $20,172 - $321,050
11,880,295
kWh
$115,751
1,327
kW-months/year
$191,133
45,292
MMBtu
$682
397
lb
$20,172
-
$
TOTAL IMPLEMENTED Savings:
$248,075
Cost:
$211,970
$190,846 7,057,918 $57,229 656 - - - - - - $190,846
7,057,918
kWh
$57,229
656
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes