IAC logo
IAC Assessment: UF0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Carbonated Soft Drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 430,000
Annual Production 27,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $338,156 6,281,340 kWh $0.05
Electricity Demand $106,133 14,639 kW-months/year $7.25
Natural Gas $81,039 30,982 MMBtu $2.62
TOTAL ENERGY COSTS $530,537
RECOMMENDED SAVINGS* $384,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ $ $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,692
Cost:
$12,162
$17,116 316,964 $3,576 41 - - - - - - - - - - - - - - $17,116
316,964
kWh
$3,576
41
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$24,940
Cost:
$30,000
$24,940 341,644 - - - - - - - - - - - - - - - - $24,940
341,644
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,684
Cost:
$23,130
$28,541 528,538 $6,143 71 - - - - - - - - - - - - - - $28,541
528,538
kWh
$6,143
71
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,852
Cost:
$550
$4,912 66,467 - - - - - - - - $(-60) - - - - - - - $4,912
66,467
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-60)
-
$
-
-
$
-
-
$
-
-
%
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,029
Cost:
$3,500
- - - - $2,029 775 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,029
775
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,444
Cost:
$4,753
$1,045 19,347 $399 5 - - - - - - - - - - - - - - $1,045
19,347
kWh
$399
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
07: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$1,449
Cost:
-
- - - - $1,449 553 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,449
553
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$11,069
Cost:
$50,413
$7,351 136,143 $4,218 48 - - - - - - $(-500) - - - - - - - $7,351
136,143
kWh
$4,218
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-500)
-
$
-
-
$
-
-
$
-
-
%
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,373
Cost:
$828
$3,373 46,213 - - - - - - - - - - - - - - - - $3,373
46,213
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
10: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$83,104
Cost:
$400,000
- - - - - - - - - - - - $83,104 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$83,104
-
$
-
-
$
-
-
%
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$642
Cost:
$1,895
- - - - - - - - - - $642 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$642
-
$
-
-
$
-
-
$
-
-
%
12: 3.4155 METER WASTE WATER Savings:
$5,209
Cost:
$1,700
- - - - - - $5,209 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,209
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
13: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$40,000
Cost:
$4,838
- - - - - - - - $40,000 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$40,000
-
$
-
-
$
-
-
$
-
-
$
-
-
%
14: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$133,295
Cost:
$97,500
- - - - - - - - - - - - - - - - $133,295 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
$133,295
-
%
15: 4.632 CHANGE OPERATING CONDITIONS Savings:
$4,941
Cost:
$5,000
- - - - - - - - - - - - - - $4,941 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
$4,941
-
$
-
-
%
16: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$2,808
Cost:
$864
- - - - - - - - - - $2,808 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$2,808
-
$
-
-
$
-
-
$
-
-
%
17: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$10,000
Cost:
$752
- - - - - - - - - - $10,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$10,000
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$384,531
Cost:
$637,885
$87,278 1,455,316 $14,336 165 $3,478 1,328 $5,209 - $40,000 - $12,890 - $83,104 - $4,941 - $133,295 - $87,278
1,455,316
kWh
$14,336
165
kW-months/year
$3,478
1,328
MMBtu
$5,209
-
Tgal
$40,000
-
$
$12,890
-
$
$83,104
-
$
$4,941
-
$
$133,295
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Raw Material Primary Product Increase in Production