IAC logo
IAC Assessment: UF0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Cement Products
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 18
Plant Area (Sq.Ft.) 600,000
Annual Production 19,000 Units
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,975 4,397,400 kWh $0.05
Electricity Demand $33,224 11,214 kW-months/year $2.96
TOTAL ENERGY COSTS $255,993
RECOMMENDED SAVINGS* $40,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,078
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,883
Cost:
$7,110
$3,082 61,631 $801 23 - - - - - - - - $3,082
61,631
kWh
$801
23
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$10,820
Cost:
$15,547
$7,245 144,908 $3,770 106 - - - - $(-195) - - - $7,245
144,908
kWh
$3,770
106
kW-months/year
-
-
gal
-
-
lb
$(-195)
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,012
Cost:
$230
$2,084 34,736 - - - - - - $(-72) - - - $2,084
34,736
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$(-72)
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,442
Cost:
$10,641
$5,600 111,994 $2,842 80 - - - - - - - - $5,600
111,994
kWh
$2,842
80
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$13,799
Cost:
$202,500
- - - - - - - - - - $13,799 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$13,799
-
$
06: 3.4155 METER WASTE WATER Savings:
$1,066
Cost:
$1,700
- - - - $1,066 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,066
-
gal
-
-
lb
-
-
$
-
-
$
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$728
Cost:
-
- - - - - - $728 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$728
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,750
Cost:
$237,728
$18,011 353,269 $7,413 209 $1,066 - $728 - $(-267) - $13,799 - $18,011
353,269
kWh
$7,413
209
kW-months/year
$1,066
-
gal
$728
-
lb
$(-267)
-
$
$13,799
-
$
TOTAL IMPLEMENTED Savings:
$3,078
Cost:
$1,930
$2,084 34,736 - - $1,066 - - - $(-72) - - - $2,084
34,736
kWh
-
-
kW-months/year
$1,066
-
gal
-
-
lb
$(-72)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost