IAC logo
IAC Assessment: UF0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Roof shingles
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 250,000
Annual Production 3,200,000 Pieces
Production Hrs. Annual 7,800
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $379,031 8,064,988 kWh $0.05
Electricity Demand $23,085 15,516 kW-months/year $1.49
Natural Gas $423,782 103,677 MMBtu $4.09
TOTAL ENERGY COSTS $1,182,173
RECOMMENDED SAVINGS* $506,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,290
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,514
Cost:
$1,631
$12,014 235,562 $500 28 - - - - - - - - - - $12,014
235,562
kWh
$500
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,785
Cost:
$1,826
$1,713 33,580 $72 4 - - - - - - - - - - $1,713
33,580
kWh
$72
4
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$58,093
Cost:
$31,024
- - - - $58,093 14,204 - - - - - - - - -
-
kWh
-
-
kW-months/year
$58,093
14,204
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,902
Cost:
$27,000
- - - - - - - - - - $13,902 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$13,902
-
$
-
-
%
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,223
Cost:
$973
- - - - $7,223 1,766 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,223
1,766
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
06: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$19,080
Cost:
$34,976
- - - - $19,080 4,665 - - - - - - - - -
-
kWh
-
-
kW-months/year
$19,080
4,665
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$333,770
Cost:
$250,000
$(-18,857) (-369,750) $(-3,648) (-204) - - $356,275 29,000,000 - - - - - - $(-18,857)
(-369,750)
kWh
$(-3,648)
(-204)
kW-months/year
-
-
MMBtu
$356,275
29,000,000
lb
-
-
$
-
-
$
-
-
%
08: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$57,960
Cost:
$109,500
- - - - - - - - - - - - $57,960 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$57,960
-
%
09: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$1,808
Cost:
$700
- - - - - - - - $1,808 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,808
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$506,135
Cost:
$457,630
$(-5,130) (-100,608) $(-3,076) (-172) $84,396 20,635 $356,275 29,000,000 $1,808 - $13,902 - $57,960 - $(-5,130)
(-100,608)
kWh
$(-3,076)
(-172)
kW-months/year
$84,396
20,635
MMBtu
$356,275
29,000,000
lb
$1,808
-
$
$13,902
-
$
$57,960
-
%
TOTAL IMPLEMENTED Savings:
$81,290
Cost:
$114,630
$13,727 269,142 $572 32 $7,223 1,766 - - $1,808 - - - $57,960 - $13,727
269,142
kWh
$572
32
kW-months/year
$7,223
1,766
MMBtu
-
-
lb
$1,808
-
$
-
-
$
$57,960
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production