Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2003 |
Principal Product | Herbicides, Fungicides, Pesticides |
NAICS | 325320 - Pesticide and Other Agricultural Chemical Manufacturing |
SIC | 2879 - Agricultural Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 4,000,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $289,562 | 5,475,637 | kWh | $0.05 |
Electricity Fees | $20,330 | - | $ | - |
Natural Gas | $56,051 | 12,510 | MMBtu | $4.48 |
TOTAL ENERGY COSTS | $385,654 | |||
RECOMMENDED SAVINGS* | $26,331 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,391 Cost: $5,036 |
$3,391 | 59,487 | - | - | - | - | - | - | - | - |
$3,391 59,487 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,045 Cost: $1,420 |
$2,045 | 35,878 | - | - | - | - | - | - | - | - |
$2,045 35,878 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,411 Cost: $546 |
$1,411 | 24,757 | - | - | - | - | - | - | - | - |
$1,411 24,757 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $836 Cost: $1,211 |
$836 | 14,661 | - | - | - | - | - | - | - | - |
$836 14,661 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,166 Cost: - |
$1,056 | 18,528 | - | - | - | - | $50 | - | $60 | - |
$1,056 18,528 kWh |
- - MMBtu |
- - Tgal |
$50 - $ |
$60 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $17,482 Cost: $13,000 |
- | - | $(-2,180) | (-487) | $19,662 | 44,278 | - | - | - | - |
- - kWh |
$(-2,180) (-487) MMBtu |
$19,662 44,278 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,331 Cost: $21,213 |
$8,739 | 153,311 | $(-2,180) | (-487) | $19,662 | 44,278 | $50 | - | $60 | - | $8,739 153,311 kWh |
$(-2,180) (-487) MMBtu |
$19,662 44,278 Tgal |
$50 - $ |
$60 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |