IAC logo
IAC Assessment: UF0324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Herbicides, Fungicides, Pesticides
NAICS 325320 - Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879 - Agricultural Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 65,000
Annual Production 4,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,562 5,475,637 kWh $0.05
Electricity Fees $20,330 - $ -
Natural Gas $56,051 12,510 MMBtu $4.48
TOTAL ENERGY COSTS $385,654
RECOMMENDED SAVINGS* $26,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,391
Cost:
$5,036
$3,391 59,487 - - - - - - - - $3,391
59,487
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,045
Cost:
$1,420
$2,045 35,878 - - - - - - - - $2,045
35,878
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,411
Cost:
$546
$1,411 24,757 - - - - - - - - $1,411
24,757
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$836
Cost:
$1,211
$836 14,661 - - - - - - - - $836
14,661
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,166
Cost:
-
$1,056 18,528 - - - - $50 - $60 - $1,056
18,528
kWh
-
-
MMBtu
-
-
Tgal
$50
-
$
$60
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$17,482
Cost:
$13,000
- - $(-2,180) (-487) $19,662 44,278 - - - - -
-
kWh
$(-2,180)
(-487)
MMBtu
$19,662
44,278
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$26,331
Cost:
$21,213
$8,739 153,311 $(-2,180) (-487) $19,662 44,278 $50 - $60 - $8,739
153,311
kWh
$(-2,180)
(-487)
MMBtu
$19,662
44,278
Tgal
$50
-
$
$60
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $