IAC logo
IAC Assessment: UF0366
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0366
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2005
Principal Product Dimensioned Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 150,000
Annual Production 220,000 Thousand Feet
Production Hrs. Annual 6,084
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,327,138 29,606,560 kWh $0.04
TOTAL ENERGY COSTS $1,327,138
RECOMMENDED SAVINGS* $2,025,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,324
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,767
Cost:
$10,560
$12,767 290,160 - - $12,767
290,160
kWh
-
-
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,584
Cost:
$2,089
$5,584 126,906 - - $5,584
126,906
kWh
-
-
MMBtu
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$9,884
Cost:
$784
$9,884 224,640 - - $9,884
224,640
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,012
Cost:
-
$3,012 68,444 - - $3,012
68,444
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$33,761
Cost:
$64,979
$33,761 767,286 - - $33,761
767,286
kWh
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,146
Cost:
$640
$2,146 48,769 - - $2,146
48,769
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$25,852
Cost:
$4,653
$25,852 587,548 - - $25,852
587,548
kWh
-
-
MMBtu
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,587
Cost:
$22,333
$4,587 104,250 - - $4,587
104,250
kWh
-
-
MMBtu
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$39,191
Cost:
$15,000
$39,191 890,698 - - $39,191
890,698
kWh
-
-
MMBtu
10: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$1,302,689
Cost:
$10,000,000
$1,302,689 29,606,560 - - $1,302,689
29,606,560
kWh
-
-
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,128
Cost:
$1,356
- - $11,128 1,712 -
-
kWh
$11,128
1,712
MMBtu
12: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$569,932
Cost:
$520,000
$569,932 12,953,000 - - $569,932
12,953,000
kWh
-
-
MMBtu
13: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$5,448
Cost:
$24,800
$5,448 123,820 - - $5,448
123,820
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$2,025,980
Cost:
$10,667,194
$2,014,852 45,792,081 $11,128 1,712 $2,014,852
45,792,081
kWh
$11,128
1,712
MMBtu
TOTAL IMPLEMENTED Savings:
$143,324
Cost:
$100,061
$132,196 3,004,451 $11,128 1,712 $132,196
3,004,451
kWh
$11,128
1,712
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas