IAC logo
IAC Assessment: UF0371
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0371
IAC Center University of Florida
Assessment Year 2005
Principal Product Military Aircrafts
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $10,000,000-$50,000,000
# of Employees 277
Plant Area (Sq.Ft.) 192,534
Annual Production 1 Units
Production Hrs. Annual 3,952
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,171 3,279,329 kWh $0.05
Electricity Demand $58,225 7,669 kW-months/year $7.59
LPG $125,092 4,355 MMBtu $28.72
TOTAL ENERGY COSTS $362,488
RECOMMENDED SAVINGS* $317,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $246,094
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Increase in Production Electricity Usage Electricity Demand LPG Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$6,120
Cost:
$978
- - - - $6,120 366 - - -
-
kWh
-
-
kW-months/year
$6,120
366
MMBtu
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,368
Cost:
$650
$2,368 41,541 - - - - - - $2,368
41,541
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$6,271
Cost:
$1,680
$3,920 103,168 $2,351 25 - - - - $3,920
103,168
kWh
$2,351
25
kW-months/year
-
-
MMBtu
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,453
Cost:
$675
$1,533 40,335 $920 10 - - - - $1,533
40,335
kWh
$920
10
kW-months/year
-
-
MMBtu
-
-
%
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,952
Cost:
$4,688
$2,952 77,685 - - - - - - $2,952
77,685
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,254
Cost:
$20,000
$3,631 95,550 $3,623 38 - - - - $3,631
95,550
kWh
$3,623
38
kW-months/year
-
-
MMBtu
-
-
%
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$18,424
Cost:
-
$18,424 484,831 - - - - - - $18,424
484,831
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,385
Cost:
-
$3,385 89,076 - - - - - - $3,385
89,076
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
09: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$5,477
Cost:
$800
- - - - $5,477 328 - - -
-
kWh
-
-
kW-months/year
$5,477
328
MMBtu
-
-
%
10: 2.5194 REDESIGN PROCESS Savings:
$61,200
Cost:
$1,000,000
- - - - $61,200 3,661 - - -
-
kWh
-
-
kW-months/year
$61,200
3,661
MMBtu
-
-
%
11: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$1,596
Cost:
$26,800
$911 23,970 $685 7 - - - - $911
23,970
kWh
$685
7
kW-months/year
-
-
MMBtu
-
-
%
12: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$100,000
Cost:
$25,000
- - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$100,000
-
%
13: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$100,000
Cost:
$50,000
- - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$100,000
-
%
TOTAL RECOMMENDED Savings:
$317,500
Cost:
$1,131,271
$37,124 956,156 $7,579 80 $72,797 4,355 $200,000 - $37,124
956,156
kWh
$7,579
80
kW-months/year
$72,797
4,355
MMBtu
$200,000
-
%
TOTAL IMPLEMENTED Savings:
$246,094
Cost:
$106,583
$30,541 782,921 $3,956 42 $11,597 694 $200,000 - $30,541
782,921
kWh
$3,956
42
kW-months/year
$11,597
694
MMBtu
$200,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand LPG Increase in Production Electricity Usage Electricity Demand LPG Increase in Production