IAC logo
IAC Assessment: UF0392
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0392
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Roofing Insulation Products
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales n/a
# of Employees 45
Plant Area (Sq.Ft.) 130,000
Annual Production 162,000,000 Units
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,338 2,086,680 kWh $0.06
Electricity Demand $34,739 6,048 kW-months/year $5.74
Natural Gas $65,614 4,632 MMBtu $14.17
TOTAL ENERGY COSTS $229,691
RECOMMENDED SAVINGS* $68,966 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$32,112
Cost:
$2,775
- - - - $12,144 855 $19,968 - -
-
kWh
-
-
kW-months/year
$12,144
855
MMBtu
$19,968
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$28,316
Cost:
$138,000
$1,320 16,711 - - $26,996 1,901 - - $1,320
16,711
kWh
-
-
kW-months/year
$26,996
1,901
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$238
Cost:
$228
$238 3,841 - - - - - - $238
3,841
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,311
Cost:
$8,824
$2,580 41,664 $731 11 - - - - $2,580
41,664
kWh
$731
11
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$535
Cost:
$486
$418 6,761 $117 2 - - - - $418
6,761
kWh
$117
2
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,532
Cost:
$585
$1,532 19,389 - - - - - - $1,532
19,389
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,922
Cost:
$1,680
$2,922 47,130 - - - - - - $2,922
47,130
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$68,966
Cost:
$152,578
$9,010 135,496 $848 13 $39,140 2,756 $19,968 - $9,010
135,496
kWh
$848
13
kW-months/year
$39,140
2,756
MMBtu
$19,968
-
$
TOTAL IMPLEMENTED Savings:
$36,955
Cost:
$12,184
$4,112 61,053 $731 11 $12,144 855 $19,968 - $4,112
61,053
kWh
$731
11
kW-months/year
$12,144
855
MMBtu
$19,968
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes