IAC logo
IAC Assessment: UF0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Flexible Packaging Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales n/a
# of Employees 53
Plant Area (Sq.Ft.) 117,000
Annual Production 43,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $180,899 3,826,074 kWh $0.05
Electricity Demand $100,294 9,591 kW-months/year $10.46
Natural Gas $74,076 4,869 MMBtu $15.21
TOTAL ENERGY COSTS $355,269
RECOMMENDED SAVINGS* $116,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,633
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$37,010
Cost:
$71,812
$29,870 622,267 $7,140 106 - - $29,870
622,267
kWh
$7,140
106
kW-months/year
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$24,700
Cost:
$17,000
$17,560 355,056 $7,140 57 - - $17,560
355,056
kWh
$7,140
57
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,158
Cost:
$1,938
- - - - $3,158 208 -
-
kWh
-
-
kW-months/year
$3,158
208
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,417
Cost:
$10,049
$5,062 62,869 $1,355 11 - - $5,062
62,869
kWh
$1,355
11
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,705
Cost:
$62,192
$10,363 215,904 $4,342 35 - - $10,363
215,904
kWh
$4,342
35
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,990
Cost:
$227
$1,990 41,458 - - - - $1,990
41,458
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,036
Cost:
$27,664
$13,389 279,512 $5,647 45 - - $13,389
279,512
kWh
$5,647
45
kW-months/year
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,457
Cost:
-
$8,457 108,994 - - - - $8,457
108,994
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$643
Cost:
-
$455 9,400 $188 2 - - $455
9,400
kWh
$188
2
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$116,116
Cost:
$190,882
$87,146 1,695,460 $25,812 256 $3,158 208 $87,146
1,695,460
kWh
$25,812
256
kW-months/year
$3,158
208
MMBtu
TOTAL IMPLEMENTED Savings:
$2,633
Cost:
$227
$2,445 50,858 $188 2 - - $2,445
50,858
kWh
$188
2
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas