IAC Assessment: UF0395
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2007
Principal Product Bottle Water
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 310,000
Annual Production 60,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,887,557 24,650,102 kWh $0.08
Electricity Demand $288,696 2,814 kW-months/year $102.59
TOTAL ENERGY COSTS $2,182,253
RECOMMENDED SAVINGS* $358,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $351,196
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,451
Cost:
$4,491
$8,237 107,538 $1,214 144 - - - - $8,237
107,538
kWh
$1,214
144
kW-months/year
-
-
$
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,897
Cost:
$345
$3,897 50,785 - - - - - - $3,897
50,785
kWh
-
-
kW-months/year
-
-
$
-
-
%
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,587
Cost:
$50
$2,292 29,927 $295 35 - - - - $2,292
29,927
kWh
$295
35
kW-months/year
-
-
$
-
-
%
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,469
Cost:
$133
$1,275 16,644 $194 23 - - - - $1,275
16,644
kWh
$194
23
kW-months/year
-
-
$
-
-
%
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,409
Cost:
$30
$2,409 31,450 - - - - - - $2,409
31,450
kWh
-
-
kW-months/year
-
-
$
-
-
%
06: 2.7145 INSTALL SKYLIGHTS Savings:
$19,110
Cost:
$35,054
$12,450 162,526 $6,660 790 - - - - $12,450
162,526
kWh
$6,660
790
kW-months/year
-
-
$
-
-
%
07: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$3,509
Cost:
$9,776
$3,509 45,804 - - - - - - $3,509
45,804
kWh
-
-
kW-months/year
-
-
$
-
-
%
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$200
Cost:
-
$49 634 - - $151 - - - $49
634
kWh
-
-
kW-months/year
$151
-
$
-
-
%
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,508
Cost:
$752
$2,508 28,407 - - - - - - $2,508
28,407
kWh
-
-
kW-months/year
-
-
$
-
-
%
10: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$77,607
Cost:
$31,201
$70,477 826,008 - - - - $7,130 - $70,477
826,008
kWh
-
-
kW-months/year
-
-
$
$7,130
-
%
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,271
Cost:
-
$2,210 25,028 - - $36 - $25 - $2,210
25,028
kWh
-
-
kW-months/year
$36
-
$
$25
-
%
12: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$53,219
Cost:
$20,339
$46,249 603,772 $6,970 827 - - - - $46,249
603,772
kWh
$6,970
827
kW-months/year
-
-
$
-
-
%
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$180,645
Cost:
$263,004
$151,393 1,976,411 $29,252 3,470 - - - - $151,393
1,976,411
kWh
$29,252
3,470
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$358,882
Cost:
$365,175
$306,955 3,904,934 $44,585 5,289 $187 - $7,155 - $306,955
3,904,934
kWh
$44,585
5,289
kW-months/year
$187
-
$
$7,155
-
%
TOTAL IMPLEMENTED Savings:
$351,196
Cost:
$354,514
$299,614 3,813,445 $44,391 5,266 $36 - $7,155 - $299,614
3,813,445
kWh
$44,391
5,266
kW-months/year
$36
-
$
$7,155
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Ancillary Material Cost Increase in Production