IAC Center | University of Florida |
---|---|
Assessment Year | 2007 |
Principal Product | d'Limonene |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2840 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 39 |
Plant Area (Sq.Ft.) | 44,000 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $107,091 | 1,461,000 | kWh | $0.07 |
Electricity Demand | $25,936 | 3,105 | kW-months/year | $8.35 |
Electricity Fees | $17,374 | - | $ | - |
Other Energy | $186,034 | 10,682 | MMBtu | $17.42 |
TOTAL ENERGY COSTS | $336,435 | |||
RECOMMENDED SAVINGS* | $100,444 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,162 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,223 Cost: $4,805 |
$1,923 | 26,238 | $300 | 3 | - | - | - | - | - | - |
$1,923 26,238 kWh |
$300 3 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $364 Cost: $1,126 |
$364 | 4,966 | - | - | - | - | - | - | - | - |
$364 4,966 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $8,125 Cost: $6,679 |
$8,125 | 89,183 | - | - | - | - | - | - | - | - |
$8,125 89,183 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,101 Cost: $642 |
$2,101 | 23,065 | - | - | - | - | - | - | - | - |
$2,101 23,065 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $282 Cost: $609 |
$231 | 3,147 | $51 | 1 | - | - | - | - | - | - |
$231 3,147 kWh |
$51 1 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $347 Cost: - |
$347 | 2,222 | - | - | - | - | - | - | - | - |
$347 2,222 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $731 Cost: $810 |
- | - | - | - | $731 | 457 | - | - | - | - |
- - kWh |
- - kW-months/year |
$731 457 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,401 Cost: - |
$1,401 | 15,376 | - | - | - | - | - | - | - | - |
$1,401 15,376 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,300 Cost: $477 |
$3,300 | 36,228 | - | - | - | - | - | - | - | - |
$3,300 36,228 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $72,041 Cost: $30,000 |
- | - | - | - | - | - | - | - | $72,041 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$72,041 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $2,041 Cost: $4,160 |
$2,041 | 27,844 | - | - | - | - | - | - | - | - |
$2,041 27,844 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $7,488 Cost: $970 |
- | - | - | - | - | - | $7,488 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$7,488 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $100,444 Cost: $50,278 |
$19,833 | 228,269 | $351 | 4 | $731 | 457 | $7,488 | - | $72,041 | - | $19,833 228,269 kWh |
$351 4 kW-months/year |
$731 457 gal |
$7,488 - $ |
$72,041 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,162 Cost: $2,538 |
$7,380 | 80,038 | $51 | 1 | $731 | 457 | - | - | - | - | $7,380 80,038 kWh |
$51 1 kW-months/year |
$731 457 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost |