IAC logo
IAC Assessment: UF0398
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0398
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2007
Principal Product Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 140,000
Annual Production 40,000 Thousand Gallons
Production Hrs. Annual 7,956
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $938,245 12,867,277 kWh $0.07
Electricity Demand $196,400 46,447 kW-months/year $4.23
Natural Gas $357,502 44,759 MMBtu $7.99
TOTAL ENERGY COSTS $1,492,147
RECOMMENDED SAVINGS* $306,997 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48,081
Cost:
$134,669
$44,401 608,227 $3,680 73 - - $44,401
608,227
kWh
$3,680
73
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$940
Cost:
-
$793 10,857 $147 3 - - $793
10,857
kWh
$147
3
kW-months/year
-
-
MMBtu
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$477
Cost:
$150
$436 5,975 $41 1 - - $436
5,975
kWh
$41
1
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$806
Cost:
$118
$806 11,046 - - - - $806
11,046
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,676
Cost:
$218
- - - - $4,676 584 -
-
kWh
-
-
kW-months/year
$4,676
584
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,060
Cost:
$1,600
$3,060 41,913 - - - - $3,060
41,913
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$32,078
Cost:
$6,105
$32,078 400,979 - - - - $32,078
400,979
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$547
Cost:
-
$547 5,363 - - - - $547
5,363
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,769
Cost:
$19,429
$6,185 84,848 $584 12 - - $6,185
84,848
kWh
$584
12
kW-months/year
-
-
MMBtu
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$209,563
Cost:
$17,000
$192,051 2,584,624 $17,512 345 - - $192,051
2,584,624
kWh
$17,512
345
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$306,997
Cost:
$179,289
$280,357 3,753,832 $21,964 434 $4,676 584 $280,357
3,753,832
kWh
$21,964
434
kW-months/year
$4,676
584
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas