Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2007 |
Principal Product | bottled water |
NAICS | 312112 - Bottled Water Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 425,000 |
Annual Production | 1,030,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,962,005 | 45,302,051 | kWh | $0.09 |
Electricity Demand | $348,787 | 177,655 | kW-months/year | $1.96 |
Natural Gas | $142,529 | 130,310 | MMBtu | $1.09 |
TOTAL ENERGY COSTS | $4,453,321 | |||
RECOMMENDED SAVINGS* | $5,057,012 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $272,457 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $1,441 Cost: $253 |
$1,399 | 16,074 | $42 | 2 | - | - | - | - |
$1,399 16,074 kWh |
$42 2 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $372 Cost: $289 |
$372 | 4,284 | - | - | - | - | - | - |
$372 4,284 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $6,690 Cost: $625 |
$6,690 | 76,894 | - | - | - | - | - | - |
$6,690 76,894 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $6,004 Cost: $399 |
$6,004 | 63,204 | - | - | - | - | - | - |
$6,004 63,204 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $17,857 Cost: $619 |
- | - | - | - | $17,857 | 1,638 | - | - |
- - kWh |
- - kW-months/year |
$17,857 1,638 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $17,557 Cost: $714 |
$17,557 | 184,808 | - | - | - | - | - | - |
$17,557 184,808 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $229,959 Cost: - |
$229,959 | 2,420,621 | - | - | - | - | - | - |
$229,959 2,420,621 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $6,754 Cost: $22,000 |
- | - | - | - | $6,754 | 619 | - | - |
- - kWh |
- - kW-months/year |
$6,754 619 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $7,084 Cost: $1,380 |
- | - | - | - | $7,084 | 650 | - | - |
- - kWh |
- - kW-months/year |
$7,084 650 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,733 Cost: $6,479 |
$18,733 | 197,608 | - | - | - | - | - | - |
$18,733 197,608 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY |
Savings: $4,744,561 Cost: $5,831 |
- | - | - | - | - | - | $4,744,561 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,744,561 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,057,012 Cost: $38,589 |
$280,714 | 2,963,493 | $42 | 2 | $31,695 | 2,907 | $4,744,561 | - | $280,714 2,963,493 kWh |
$42 2 kW-months/year |
$31,695 2,907 MMBtu |
$4,744,561 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $272,457 Cost: $2,713 |
$247,516 | 2,605,429 | - | - | $24,941 | 2,288 | - | - | $247,516 2,605,429 kWh |
- - kW-months/year |
$24,941 2,288 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |