IAC logo
IAC Assessment: UF0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product Magazines
NAICS 323117 - Books Printing
SIC 2732 - Book Printing
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 85,000
Annual Production 300,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $568,022 7,743,600 kWh $0.07
Electricity Demand $57,282 15,474 kW-months/year $3.70
Electricity Fees $305 - $ -
Natural Gas $132,408 9,025 MMBtu $14.67
Other Gas $59,623 3,495 MMBtu $17.06
TOTAL ENERGY COSTS $817,640
RECOMMENDED SAVINGS* $252,128 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$11,798
Cost:
$16,755
$11,798 161,615 - - - - - - - - $11,798
161,615
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,549
Cost:
$1,248
$8,549 117,109 - - - - - - - - $8,549
117,109
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$349
Cost:
$29
$349 4,780 - - - - - - - - $349
4,780
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$2,156
Cost:
$20,960
$2,156 26,242 - - - - - - - - $2,156
26,242
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$764
Cost:
$2,390
- - - - $764 51 - - - - -
-
kWh
-
-
kW-months/year
$764
51
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$48,158
Cost:
$1,870
$48,158 594,538 - - - - - - - - $48,158
594,538
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,082
Cost:
$24,230
$22,082 272,613 - - - - - - - - $22,082
272,613
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,400
Cost:
$10,830
$3,027 41,444 $373 8 - - - - - - $3,027
41,444
kWh
$373
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$17,491
Cost:
$25,340
$17,491 239,596 - - - - - - - - $17,491
239,596
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$2,511
Cost:
$406
$2,347 32,148 $164 4 - - - - - - $2,347
32,148
kWh
$164
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,589
Cost:
$794
$1,589 21,767 - - - - - - - - $1,589
21,767
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,401
Cost:
$10,282
$7,823 110,685 $578 13 - - - - - - $7,823
110,685
kWh
$578
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,180
Cost:
$162
$1,180 16,175 - - - - - - - - $1,180
16,175
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$76,789
Cost:
$12,000
- - - - - - - - $76,789 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$76,789
-
$
15: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$46,911
Cost:
-
- - - - - - $46,911 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$46,911
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$252,128
Cost:
$127,296
$126,549 1,638,712 $1,115 25 $764 51 $46,911 - $76,789 - $126,549
1,638,712
kWh
$1,115
25
kW-months/year
$764
51
MMBtu
$46,911
-
$
$76,789
-
$
TOTAL IMPLEMENTED Savings:
$106,320
Cost:
$6,331
$58,645 738,194 - - $764 51 $46,911 - - - $58,645
738,194
kWh
-
-
kW-months/year
$764
51
MMBtu
$46,911
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material