Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2008 |
Principal Product | Wheels |
NAICS | 331524 - Aluminum Foundries (except Die-Casting) |
SIC | 3365 - Aluminum Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 128 |
Plant Area (Sq.Ft.) | 62,000 |
Annual Production | 453,522 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $409,526 | 5,696,324 | kWh | $0.07 |
TOTAL ENERGY COSTS | $409,526 | |||
RECOMMENDED SAVINGS* | $248,815 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $70,456 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Consumption | Increase in Production | Electricity Usage | Natural Gas | Water Consumption | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,814 Cost: $810 |
$5,814 | 80,757 | - | - | - | - | - | - |
$5,814 80,757 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $34,500 Cost: $54,000 |
$34,500 | 487,000 | - | - | - | - | - | - |
$34,500 487,000 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,206 Cost: $16,270 |
$4,206 | 56,055 | - | - | - | - | - | - |
$4,206 56,055 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,150 Cost: $219 |
$1,150 | 18,257 | - | - | - | - | - | - |
$1,150 18,257 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $14,800 Cost: $1,117 |
$14,800 | 208,927 | - | - | - | - | - | - |
$14,800 208,927 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $13,321 Cost: $13,321 |
$13,321 | 211,444 | - | - | - | - | - | - |
$13,321 211,444 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $12,742 Cost: $20,000 |
- | - | $12,742 | 1,213 | - | - | - | - |
- - kWh |
$12,742 1,213 MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $871 Cost: $2,000 |
$871 | 13,802 | - | - | - | - | - | - |
$871 13,802 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $151,840 Cost: $16,695 |
- | - | - | - | - | - | $151,840 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$151,840 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $9,571 Cost: $1,500 |
- | - | - | - | $9,571 | - | - | - |
- - kWh |
- - MMBtu |
$9,571 - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $248,815 Cost: $125,932 |
$74,662 | 1,076,242 | $12,742 | 1,213 | $9,571 | - | $151,840 | - | $74,662 1,076,242 kWh |
$12,742 1,213 MMBtu |
$9,571 - Tgal |
$151,840 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $70,456 Cost: $71,467 |
$70,456 | 1,020,187 | - | - | - | - | - | - | $70,456 1,020,187 kWh |
- - MMBtu |
- - Tgal |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Consumption | Increase in Production | Electricity Usage | Natural Gas | Water Consumption | Increase in Production |