Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2008 |
Principal Product | Prestressed Concrete Strand |
NAICS | 331222 - Steel Wire Drawing |
SIC | 3315 - Steel Wire And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 63 |
Plant Area (Sq.Ft.) | 116,000 |
Annual Production | 62,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,743,998 | 22,464,000 | kWh | $0.08 |
Natural Gas | $133,156 | 149,730 | MMBtu | $0.89 |
TOTAL ENERGY COSTS | $1,925,154 | |||
RECOMMENDED SAVINGS* | $217,491 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,714 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Electricity Usage | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $32,847 Cost: $36,441 |
$32,847 | 434,066 | - | - | - | - |
$32,847 434,066 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $2,012 Cost: - |
$2,012 | 28,739 | - | - | - | - |
$2,012 28,739 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $10,710 Cost: - |
$10,710 | 153,007 | - | - | - | - |
$10,710 153,007 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,992 Cost: - |
$8,992 | 11,530 | - | - | - | - |
$8,992 11,530 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $14,617 Cost: - |
$14,617 | 188,101 | - | - | - | - |
$14,617 188,101 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $12,647 Cost: $900 |
$12,647 | 180,677 | - | - | - | - |
$12,647 180,677 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $19,601 Cost: $64,339 |
$19,601 | 251,159 | - | - | - | - |
$19,601 251,159 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $3,201 Cost: $1,200 |
- | - | $3,201 | 339 | - | - |
- - kWh |
$3,201 339 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $65,568 Cost: $31,410 |
$65,568 | 773,149 | - | - | - | - |
$65,568 773,149 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $45,096 Cost: $15,000 |
- | - | - | - | $45,096 | 9,600 |
- - kWh |
- - MMBtu |
$45,096 9,600 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,200 Cost: $4,158 |
- | - | - | - | $2,200 | 9,600 |
- - kWh |
- - MMBtu |
$2,200 9,600 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $217,491 Cost: $153,448 |
$166,994 | 2,020,428 | $3,201 | 339 | $47,296 | 19,200 | $166,994 2,020,428 kWh |
$3,201 339 MMBtu |
$47,296 19,200 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,714 Cost: - |
$21,714 | 193,276 | - | - | - | - | $21,714 193,276 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Electricity Usage | Natural Gas | Water Disposal |