IAC Assessment: UF0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product Prestressed Concrete Strand
NAICS 331222 - Steel Wire Drawing
SIC 3315 - Steel Wire And Related Products
Sales $50,000,000-$100,000,000
# of Employees 63
Plant Area (Sq.Ft.) 116,000
Annual Production 62,000 Tons
Production Hrs. Annual 8,400
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,743,998 22,464,000 kWh $0.08
Natural Gas $133,156 149,730 MMBtu $0.89
TOTAL ENERGY COSTS $1,925,154
RECOMMENDED SAVINGS* $217,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,714
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,847
Cost:
$36,441
$32,847 434,066 - - - - $32,847
434,066
kWh
-
-
MMBtu
-
-
Tgal
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,012
Cost:
-
$2,012 28,739 - - - - $2,012
28,739
kWh
-
-
MMBtu
-
-
Tgal
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,710
Cost:
-
$10,710 153,007 - - - - $10,710
153,007
kWh
-
-
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,992
Cost:
-
$8,992 11,530 - - - - $8,992
11,530
kWh
-
-
MMBtu
-
-
Tgal
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$14,617
Cost:
-
$14,617 188,101 - - - - $14,617
188,101
kWh
-
-
MMBtu
-
-
Tgal
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$12,647
Cost:
$900
$12,647 180,677 - - - - $12,647
180,677
kWh
-
-
MMBtu
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,601
Cost:
$64,339
$19,601 251,159 - - - - $19,601
251,159
kWh
-
-
MMBtu
-
-
Tgal
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$3,201
Cost:
$1,200
- - $3,201 339 - - -
-
kWh
$3,201
339
MMBtu
-
-
Tgal
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$65,568
Cost:
$31,410
$65,568 773,149 - - - - $65,568
773,149
kWh
-
-
MMBtu
-
-
Tgal
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$45,096
Cost:
$15,000
- - - - $45,096 9,600 -
-
kWh
-
-
MMBtu
$45,096
9,600
Tgal
11: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,200
Cost:
$4,158
- - - - $2,200 9,600 -
-
kWh
-
-
MMBtu
$2,200
9,600
Tgal
TOTAL RECOMMENDED Savings:
$217,491
Cost:
$153,448
$166,994 2,020,428 $3,201 339 $47,296 19,200 $166,994
2,020,428
kWh
$3,201
339
MMBtu
$47,296
19,200
Tgal
TOTAL IMPLEMENTED Savings:
$21,714
Cost:
-
$21,714 193,276 - - - - $21,714
193,276
kWh
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal