IAC Assessment: UF0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product PVC pipe
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,500
Annual Production 130,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,214,967 18,261,600 kWh $0.07
Electricity Demand $321,252 34,773 kW-months/year $9.24
Electricity Fees $48,398 - $ -
TOTAL ENERGY COSTS $1,584,617
RECOMMENDED SAVINGS* $349,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,953
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$20,962
Cost:
$1,500
$20,962 303,798 - - - - - - - - $20,962
303,798
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$4,076
Cost:
$2,560
$4,076 59,069 - - - - - - - - $4,076
59,069
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,047
Cost:
$1,060
$3,047 35,027 - - - - - - - - $3,047
35,027
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,106
Cost:
-
$4,106 47,197 - - - - - - - - $4,106
47,197
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,900
Cost:
$800
$1,900 21,845 - - - - - - - - $1,900
21,845
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,637
Cost:
$30,850
$12,465 180,648 $4,172 3,648 - - - - - - $12,465
180,648
kWh
$4,172
3,648
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$3,791
Cost:
-
- - - - $3,791 23,400 - - - - -
-
kWh
-
-
kW-months/year
$3,791
23,400
MMBtu
-
-
$
-
-
$
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$39,146
Cost:
$1,589
$39,146 567,336 - - - - - - - - $39,146
567,336
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$7,856
Cost:
$809
$7,856 113,848 - - - - - - - - $7,856
113,848
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,945
Cost:
$34,619
$12,092 169,944 $1,853 194 - - - - - - $12,092
169,944
kWh
$1,853
194
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,889
Cost:
$6,806
$5,889 85,350 - - - - - - - - $5,889
85,350
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$729
Cost:
-
$729 5,481 - - - - - - - - $729
5,481
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$48,442
Cost:
$82,588
$47,460 531,529 $982 103 - - - - - - $47,460
531,529
kWh
$982
103
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$170,526
Cost:
$5,967
$169,011 2,121,072 $1,515 159 - - - - - - $169,011
2,121,072
kWh
$1,515
159
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
15: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$6,175
Cost:
$161
- - - - - - - - $6,175 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$6,175
-
$
16: 3.4133 CLEAN FOULING FROM WATER LINES REGULARLY Savings:
$2,344
Cost:
$7,838
- - - - - - $2,344 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,344
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$349,571
Cost:
$177,147
$328,739 4,242,144 $8,522 4,104 $3,791 23,400 $2,344 - $6,175 - $328,739
4,242,144
kWh
$8,522
4,104
kW-months/year
$3,791
23,400
MMBtu
$2,344
-
$
$6,175
-
$
TOTAL IMPLEMENTED Savings:
$74,953
Cost:
$21,623
$62,643 887,956 - - $3,791 23,400 $2,344 - $6,175 - $62,643
887,956
kWh
-
-
kW-months/year
$3,791
23,400
MMBtu
$2,344
-
$
$6,175
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Primary Raw Material