IAC Assessment: UF0428
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0428
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2009
Principal Product electronics
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 150,000
Annual Production 500,000 Pieces
Production Hrs. Annual 4,590
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $395,986 6,016,186 kWh $0.07
TOTAL ENERGY COSTS $395,986
RECOMMENDED SAVINGS* $97,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,322
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 3.7135 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING Savings:
$1,734
Cost:
-
$1,734 26,276 $1,734
26,276
kWh
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,365
Cost:
-
$1,365 20,689 $1,365
20,689
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,980
Cost:
$5,895
$11,980 130,650 $11,980
130,650
kWh
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,371
Cost:
$2,260
$6,371 70,019 $6,371
70,019
kWh
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$872
Cost:
$1,971
$872 13,217 $872
13,217
kWh
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$674
Cost:
-
$674 7,412 $674
7,412
kWh
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,285
Cost:
-
$4,285 47,096 $4,285
47,096
kWh
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$44,818
Cost:
$3,326
$44,818 - $44,818
-
kWh
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$25,086
Cost:
-
$25,086 275,678 $25,086
275,678
kWh
TOTAL RECOMMENDED Savings:
$97,185
Cost:
$13,452
$97,185 591,037 $97,185
591,037
kWh
TOTAL IMPLEMENTED Savings:
$45,322
Cost:
$7,866
$45,322 513,606 $45,322
513,606
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage