IAC logo
IAC Assessment: UF0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2010
Principal Product Mrhyl Ester
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 22,000
Annual Production 19,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $180,617 2,045,888 kWh $0.09
Electricity Demand $36,740 4,584 kW-months/year $8.01
Electricity Fees $28,122 - $ -
Natural Gas $101,961 14,471 MMBtu $7.05
TOTAL ENERGY COSTS $347,440
RECOMMENDED SAVINGS* $78,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,739
Cost:
$32,047
$33,434 334,150 $305 38 - - - - $33,434
334,150
kWh
$305
38
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$4,188
Cost:
$5,591
- - - - $4,188 594 - - -
-
kWh
-
-
kW-months/year
$4,188
594
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,940
Cost:
$2,240
$14,735 140,758 $205 25 - - - - $14,735
140,758
kWh
$205
25
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,539
Cost:
$719
$1,539 17,095 - - - - - - $1,539
17,095
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$6,416
Cost:
$768
$6,416 59,405 - - - - - - $6,416
59,405
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$1,520
Cost:
-
$1,520 14,079 - - - - - - $1,520
14,079
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,000
Cost:
$2,700
$3,000 27,781 - - - - - - $3,000
27,781
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$364
Cost:
-
$364 4,013 - - - - - - $364
4,013
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2615 CLEAN CONDENSER TUBES Savings:
$1,343
Cost:
$120
$1,343 12,438 - - - - - - $1,343
12,438
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$3,120
Cost:
-
- - - - - - $3,120 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,120
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,637
Cost:
$1,500
$8,637 95,966 - - - - - - $8,637
95,966
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$78,806
Cost:
$45,685
$70,988 705,685 $510 63 $4,188 594 $3,120 - $70,988
705,685
kWh
$510
63
kW-months/year
$4,188
594
MMBtu
$3,120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $