IAC Assessment: UF0501
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Turpentines and Tall Oils (30 products)
NAICS 325194 - Cyclic Crude, Intermediate, and Gum and Wood Chemical Manufacturing
SIC 2861 - Gum And Wood Chemicals
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 740,520
Annual Production 70,939,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,617,971 32,723,792 kWh $0.08
Natural Gas $3,538,713 1,363,444 MMBtu $2.60
TOTAL ENERGY COSTS $6,156,684
RECOMMENDED SAVINGS* $1,711,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $317,468
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,393,980
Cost:
$3,306,000
$2,040,000 25,500,000 - - $(-646,020) (-217,515) $2,040,000
25,500,000
kWh
-
-
$
$(-646,020)
(-217,515)
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$154,176
Cost:
$60,284
- - $154,176 - - - -
-
kWh
$154,176
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$77,438
Cost:
$2,184
$77,438 967,980 - - - - $77,438
967,980
kWh
-
-
$
-
-
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$32,236
Cost:
$1,794
- - - - $32,236 10,854 -
-
kWh
-
-
$
$32,236
10,854
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$29,058
Cost:
$39,050
$29,058 363,228 - - - - $29,058
363,228
kWh
-
-
$
-
-
MMBtu
06: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$9,110
Cost:
$700
$9,110 113,880 - - - - $9,110
113,880
kWh
-
-
$
-
-
MMBtu
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$6,596
Cost:
$11,216
- - - - $6,596 2,221 -
-
kWh
-
-
$
$6,596
2,221
MMBtu
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,834
Cost:
-
$5,834 72,927 - - - - $5,834
72,927
kWh
-
-
$
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,020
Cost:
$482
$3,020 37,755 - - - - $3,020
37,755
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,711,448
Cost:
$3,421,710
$2,164,460 27,055,770 $154,176 - $(-607,188) (-204,440) $2,164,460
27,055,770
kWh
$154,176
-
$
$(-607,188)
(-204,440)
MMBtu
TOTAL IMPLEMENTED Savings:
$317,468
Cost:
$115,710
$124,460 1,555,770 $154,176 - $38,832 13,075 $124,460
1,555,770
kWh
$154,176
-
$
$38,832
13,075
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas