IAC Assessment: UF0511
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0511
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 65
Plant Area (Sq.Ft.) 2,494,796
Annual Production 6,413,787,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $372,332 18,074,400 kWh $0.02
Electricity Demand $524,061 40,584 kW-months/year $12.91
Electricity Fees $413,655 - $ -
Natural Gas $572,444 60,667 MMBtu $9.44
TOTAL ENERGY COSTS $1,882,492
RECOMMENDED SAVINGS* $6,501,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $503,254
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$5,783,172
Cost:
$13,354,800
- - - - $572,444 60,666 $5,210,728 552,218 - - -
-
kWh
-
-
kW-months/year
$572,444
60,666
MMBtu
$5,210,728
552,218
MMBtu
-
-
lb
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$200,909
Cost:
$20,000
- - - - $200,909 21,292 - - - - -
-
kWh
-
-
kW-months/year
$200,909
21,292
MMBtu
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,022
Cost:
$14,000
$2,947 143,080 $6,074 470 - - - - - - $2,947
143,080
kWh
$6,074
470
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,447
Cost:
$20,214
$7,447 361,488 - - - - - - - - $7,447
361,488
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,152
Cost:
$2,800
- - - - $5,152 546 - - - - -
-
kWh
-
-
kW-months/year
$5,152
546
MMBtu
-
-
MMBtu
-
-
lb
06: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$495,807
Cost:
$1,875,550
$(-2,256) (-109,500) $(-1,937) (-150) - - - - $500,000 2,000,000 $(-2,256)
(-109,500)
kWh
$(-1,937)
(-150)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$500,000
2,000,000
lb
TOTAL RECOMMENDED Savings:
$6,501,509
Cost:
$15,287,364
$8,139 395,068 $4,137 320 $778,505 82,504 $5,210,728 552,218 $500,000 2,000,000 $8,139
395,068
kWh
$4,137
320
kW-months/year
$778,505
82,504
MMBtu
$5,210,728
552,218
MMBtu
$500,000
2,000,000
lb
TOTAL IMPLEMENTED Savings:
$503,254
Cost:
$1,895,764
$5,191 251,988 $(-1,937) (-150) - - - - $500,000 2,000,000 $5,191
251,988
kWh
$(-1,937)
(-150)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$500,000
2,000,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Other Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Gas Solid Waste (non-haz)