Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2017 |
Principal Product | Iso-E, Geraniol, Pine Oil |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 89 |
Plant Area (Sq.Ft.) | 1,100,000 |
Annual Production | 22,274 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,161,881 | 21,324,017 | kWh | $0.05 |
Electricity Demand | $237,928 | 34,810 | kW-months/year | $6.84 |
Electricity Fees | $179,996 | - | $ | - |
Natural Gas | $2,228,418 | 456,062 | MMBtu | $4.89 |
TOTAL ENERGY COSTS | $4,511,488 | |||
RECOMMENDED SAVINGS* | $953,722 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $527,397 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $401,159 Cost: $2,500,000 |
$1,182,600 | 21,900,000 | - | - | $(-474,841) | (-97,105) | - | - | - | - | $(-306,600) | - | - | - |
$1,182,600 21,900,000 kWh |
- - kW-months/year |
$(-474,841) (-97,105) MMBtu |
- - Tgal |
- - $ |
$(-306,600) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $124,880 Cost: $17,000 |
$124,880 | 2,312,640 | - | - | - | - | - | - | - | - | - | - | - | - |
$124,880 2,312,640 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $38,189 Cost: $13,000 |
$38,189 | 707,200 | - | - | - | - | - | - | - | - | - | - | - | - |
$38,189 707,200 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $23,030 Cost: $40,000 |
$23,030 | 426,480 | - | - | - | - | - | - | - | - | - | - | - | - |
$23,030 426,480 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2112 USE CORRECT SIZE STEAM TRAPS |
Savings: $27,893 Cost: $340 |
- | - | - | - | $27,893 | 5,704 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$27,893 5,704 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $10,845 Cost: $2,750 |
$10,845 | 200,809 | - | - | - | - | - | - | - | - | - | - | - | - |
$10,845 200,809 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $26,348 Cost: $725 |
$26,348 | 487,582 | - | - | - | - | - | - | - | - | - | - | - | - |
$26,348 487,582 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $9,636 Cost: $6,225 |
$4,324 | 80,066 | $749 | 110 | - | - | - | - | $4,563 | - | - | - | - | - |
$4,324 80,066 kWh |
$749 110 kW-months/year |
- - MMBtu |
- - Tgal |
$4,563 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $4,891 Cost: - |
- | - | - | - | $3,068 | 630 | $1,823 | 480 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,068 630 MMBtu |
$1,823 480 Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $3,951 Cost: $11,185 |
$3,951 | 73,164 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,951 73,164 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $2,136 Cost: $1,562 |
$2,136 | 39,560 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,136 39,560 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $280,764 Cost: $300,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $280,764 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
$280,764 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $953,722 Cost: $2,892,787 |
$1,416,303 | 26,227,501 | $749 | 110 | $(-443,880) | (-90,771) | $1,823 | 480 | $4,563 | - | $(-306,600) | - | $280,764 | - | $1,416,303 26,227,501 kWh |
$749 110 kW-months/year |
$(-443,880) (-90,771) MMBtu |
$1,823 480 Tgal |
$4,563 - $ |
$(-306,600) - $ |
$280,764 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $527,397 Cost: $351,225 |
$208,537 | 3,861,461 | $749 | 110 | $30,961 | 6,334 | $1,823 | 480 | $4,563 | - | - | - | $280,764 | - | $208,537 3,861,461 kWh |
$749 110 kW-months/year |
$30,961 6,334 MMBtu |
$1,823 480 Tgal |
$4,563 - $ |
- - $ |
$280,764 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Administrative Changes | By-product Production |