Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2017 |
Principal Product | Apple and Citrus Flavors |
NAICS | 311423 - Dried and Dehydrated Food Manufacturing |
SIC | 2034 - Dehydrated Fruits, Vegetables, Soups |
Sales | $10,000,000-$50,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 49,295 |
Annual Production | 26,566,000 Pounds |
Production Hrs. Annual | 4,992 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $106,099 | 1,837,840 | kWh | $0.06 |
Electricity Demand | $37,833 | 4,855 | kW-months/year | $7.79 |
Electricity Fees | $23,802 | - | $ | - |
Natural Gas | $75,908 | 10,608 | MMBtu | $7.16 |
TOTAL ENERGY COSTS | $243,643 | |||
RECOMMENDED SAVINGS* | $103,314 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,802 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $38,664 Cost: $30,000 |
- | - | - | - | $38,664 | 5,400 | - | - |
- - kWh |
- - kW-months/year |
$38,664 5,400 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $25,893 Cost: $3,150 |
$25,893 | 454,272 | - | - | - | - | - | - |
$25,893 454,272 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $14,487 Cost: $23,157 |
$14,487 | 254,160 | - | - | - | - | - | - |
$14,487 254,160 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS |
Savings: $7,542 Cost: - |
- | - | - | - | $3,798 | 530 | $3,744 | - |
- - kWh |
- - kW-months/year |
$3,798 530 MMBtu |
$3,744 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $6,342 Cost: $27,695 |
$6,342 | 111,266 | - | - | - | - | - | - |
$6,342 111,266 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,848 Cost: $10,386 |
$4,265 | 74,821 | $1,583 | 203 | - | - | - | - |
$4,265 74,821 kWh |
$1,583 203 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,443 Cost: $1,481 |
- | - | - | - | $2,443 | 341 | - | - |
- - kWh |
- - kW-months/year |
$2,443 341 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,095 Cost: $5,053 |
$2,095 | 36,757 | - | - | - | - | - | - |
$2,095 36,757 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $103,314 Cost: $100,922 |
$53,082 | 931,276 | $1,583 | 203 | $44,905 | 6,272 | $3,744 | - | $53,082 931,276 kWh |
$1,583 203 kW-months/year |
$44,905 6,272 MMBtu |
$3,744 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,802 Cost: $60,536 |
$48,817 | 856,455 | - | - | $6,241 | 872 | $3,744 | - | $48,817 856,455 kWh |
- - kW-months/year |
$6,241 872 MMBtu |
$3,744 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |