IAC logo
IAC Assessment: UF0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2018
Principal Product Surgical and Medical Instruments and Apparatus
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 818
Plant Area (Sq.Ft.) 63,210
Annual Production 10,000,000 Units
Production Hrs. Annual 6,256
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $391,169 5,588,135 kWh $0.07
Electricity Demand $68,058 8,507 kW-months/year $8.00
Electricity Fees $16,848 - $ -
Natural Gas $17,894 7,334 MMBtu $2.44
TOTAL ENERGY COSTS $552,737
RECOMMENDED SAVINGS* $427,147 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,301
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$120,914
Cost:
$400,000
$131,376 1,876,800 $28,800 3,600 $(-37,200) (-15,246) - - $(-2,062) - - - $131,376
1,876,800
kWh
$28,800
3,600
kW-months/year
$(-37,200)
(-15,246)
MMBtu
-
-
$
$(-2,062)
-
$
-
-
$
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$6,142
Cost:
$18,013
$6,142 87,740 - - - - - - - - - - $6,142
87,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,159
Cost:
$12,014
$3,167 45,246 $992 123 - - - - - - - - $3,167
45,246
kWh
$992
123
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$200,000
Cost:
$100,000
- - - - - - $42,000 - - - $158,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42,000
-
$
-
-
$
$158,000
-
$
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$42,000
Cost:
$70,000
- - - - - - $42,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42,000
-
$
-
-
$
-
-
$
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$30,207
Cost:
$5,350
$(-97) (-1,387) $(-182) (-23) - - $8,112 - $22,374 - - - $(-97)
(-1,387)
kWh
$(-182)
(-23)
kW-months/year
-
-
MMBtu
$8,112
-
$
$22,374
-
$
-
-
$
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$23,725
Cost:
$10,695
- - - - - - $23,725 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,725
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$427,147
Cost:
$616,072
$140,588 2,008,399 $29,610 3,700 $(-37,200) (-15,246) $115,837 - $20,312 - $158,000 - $140,588
2,008,399
kWh
$29,610
3,700
kW-months/year
$(-37,200)
(-15,246)
MMBtu
$115,837
-
$
$20,312
-
$
$158,000
-
$
TOTAL IMPLEMENTED Savings:
$52,301
Cost:
$100,027
$9,309 132,986 $992 123 - - $42,000 - - - - - $9,309
132,986
kWh
$992
123
kW-months/year
-
-
MMBtu
$42,000
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes By-product Production