IAC logo
IAC Assessment: UF0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2018
Principal Product Orthopedic Prosthetic and Surgical Appliances and Supplies
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 60,000
Annual Production 22,000 Units
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,307 2,081,366 kWh $0.11
Electricity Demand $47,924 5,484 kW-months/year $8.74
Electricity Fees $31,209 - $ -
TOTAL ENERGY COSTS $305,476
RECOMMENDED SAVINGS* $150,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $150,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$24,028
Cost:
$167,216
$24,028 226,678 - - - - - - $24,028
226,678
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$9,684
Cost:
$1,980
$1,032 9,734 $252 29 $8,400 - - - $1,032
9,734
kWh
$252
29
kW-months/year
$8,400
-
$
-
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,844
Cost:
$586
$3,844 36,263 - - - - - - $3,844
36,263
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,401
Cost:
-
$2,401 22,650 - - - - - - $2,401
22,650
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$1,145
Cost:
$9,600
$1,145 10,804 - - - - - - $1,145
10,804
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$109,000
Cost:
$41,200
- - - - - - $109,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$109,000
-
$
TOTAL RECOMMENDED Savings:
$150,102
Cost:
$220,582
$32,450 306,129 $252 29 $8,400 - $109,000 - $32,450
306,129
kWh
$252
29
kW-months/year
$8,400
-
$
$109,000
-
$
TOTAL IMPLEMENTED Savings:
$150,102
Cost:
$220,582
$32,450 306,129 $252 29 $8,400 - $109,000 - $32,450
306,129
kWh
$252
29
kW-months/year
$8,400
-
$
$109,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost