IAC logo
IAC Assessment: UF0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0518
IAC Center University of Florida
Assessment Year 2018
Principal Product Orthopedic Prosthetic and Surgical Appliances and Supplies
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 60,000
Annual Production 22,000 Units
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,307 2,081,366 kWh $0.11
Electricity Demand $47,924 5,484 kW-months/year $8.74
Electricity Fees $31,209 - $ -
TOTAL ENERGY COSTS $305,476
RECOMMENDED SAVINGS* $150,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $150,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$24,028
Cost:
$167,216
$24,028 226,678 - - - - - - $24,028
226,678
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$9,684
Cost:
$1,980
$1,032 9,734 $252 29 $8,400 - - - $1,032
9,734
kWh
$252
29
kW-months/year
$8,400
-
$
-
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,844
Cost:
$586
$3,844 36,263 - - - - - - $3,844
36,263
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,401
Cost:
-
$2,401 22,650 - - - - - - $2,401
22,650
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$1,145
Cost:
$9,600
$1,145 10,804 - - - - - - $1,145
10,804
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$109,000
Cost:
$41,200
- - - - - - $109,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$109,000
-
$
TOTAL RECOMMENDED Savings:
$150,102
Cost:
$220,582
$32,450 306,129 $252 29 $8,400 - $109,000 - $32,450
306,129
kWh
$252
29
kW-months/year
$8,400
-
$
$109,000
-
$
TOTAL IMPLEMENTED Savings:
$150,102
Cost:
$220,582
$32,450 306,129 $252 29 $8,400 - $109,000 - $32,450
306,129
kWh
$252
29
kW-months/year
$8,400
-
$
$109,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost