Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Bread Products
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 63,210
Annual Production 9,360,000 Pounds
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $486,602 7,480,108 kWh $0.07
Electricity Demand $115,960 14,033 kW-months/year $8.26
Electricity Fees $390 - $ -
Natural Gas $65,643 23,873 MMBtu $2.75
TOTAL ENERGY COSTS $668,595
RECOMMENDED SAVINGS* $53,998 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,939
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,268
Cost:
$21,268
$10,041 154,482 $2,227 269 - - - - $10,041
154,482
kWh
$2,227
269
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,537
Cost:
$24,798
$7,237 111,344 $2,300 278 - - - - $7,237
111,344
kWh
$2,300
278
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,597
Cost:
$6,350
$2,597 39,953 - - - - - - $2,597
39,953
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,462
Cost:
$7,500
- - - - $2,462 895 - - -
-
kWh
-
-
kW-months/year
$2,462
895
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,160
Cost:
$456
$1,160 17,841 - - - - - - $1,160
17,841
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,039
Cost:
$1,393
$1,039 15,978 - - - - - - $1,039
15,978
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$24,935
Cost:
$1,665
- - - - - - $24,935 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,935
-
$
TOTAL RECOMMENDED Savings:
$53,998
Cost:
$63,430
$22,074 339,598 $4,527 548 $2,462 895 $24,935 - $22,074
339,598
kWh
$4,527
548
kW-months/year
$2,462
895
MMBtu
$24,935
-
$
TOTAL IMPLEMENTED Savings:
$48,939
Cost:
$49,580
$19,477 299,645 $4,527 548 - - $24,935 - $19,477
299,645
kWh
$4,527
548
kW-months/year
-
-
MMBtu
$24,935
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost