Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Treated Wastewater and Biosolids
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 435,600
Annual Production 2,659,100 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $620,725 9,891,135 kWh $0.06
TOTAL ENERGY COSTS $620,725
RECOMMENDED SAVINGS* $517,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $517,417
#|Description Savings
Cost
Status Electricity Usage Administrative Changes By-product Production Electricity Usage Administrative Changes By-product Production
$ kWh $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,828
Cost:
$109,400
$53,828 854,415 - - - - $53,828
854,415
kWh
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$42,877
Cost:
$213,770
$42,877 680,587 - - - - $42,877
680,587
kWh
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$20,145
Cost:
$54,910
$20,145 319,766 - - - - $20,145
319,766
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,617
Cost:
$472
$2,617 41,532 - - - - $2,617
41,532
kWh
-
-
$
-
-
$
05: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$1,160
Cost:
$4,000
- - $1,160 - - - -
-
kWh
$1,160
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$396,790
Cost:
$810,000
- - - - $396,790 - -
-
kWh
-
-
$
$396,790
-
$
TOTAL RECOMMENDED Savings:
$517,417
Cost:
$1,192,552
$119,467 1,896,300 $1,160 - $396,790 - $119,467
1,896,300
kWh
$1,160
-
$
$396,790
-
$
TOTAL IMPLEMENTED Savings:
$517,417
Cost:
$1,192,552
$119,467 1,896,300 $1,160 - $396,790 - $119,467
1,896,300
kWh
$1,160
-
$
$396,790
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Administrative Changes By-product Production Electricity Usage Administrative Changes By-product Production