IAC Assessment: UF0535
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 27
Plant Area (Sq.Ft.) 23,959
Annual Production 3,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,741 7,077,600 kWh $0.06
Electricity Demand $69,096 14,644 kW-months/year $4.72
Electricity Fees $8,508 - $ -
LPG $42,659 1,039 MMBtu $41.06
TOTAL ENERGY COSTS $510,004
RECOMMENDED SAVINGS* $50,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,990
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$35,230
Cost:
$127,650
$25,309 460,169 $9,921 2,103 - - - - - - $25,309
460,169
kWh
$9,921
2,103
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,527
Cost:
-
$4,838 87,971 - - - - $350 - $339 - $4,838
87,971
kWh
-
-
kW-months/year
-
-
MMBtu
$350
-
$
$339
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,486
Cost:
$3,283
$3,486 63,377 - - - - - - - - $3,486
63,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,073
Cost:
$2,563
$2,627 47,771 $446 94 - - - - - - $2,627
47,771
kWh
$446
94
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$2,330
Cost:
$6,000
- - - - $2,330 57 - - - - -
-
kWh
-
-
kW-months/year
$2,330
57
MMBtu
-
-
$
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,344
Cost:
$1,400
- - - - $1,344 33 - - - - -
-
kWh
-
-
kW-months/year
$1,344
33
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,990
Cost:
$140,896
$36,260 659,288 $10,367 2,197 $3,674 89 $350 - $339 - $36,260
659,288
kWh
$10,367
2,197
kW-months/year
$3,674
89
MMBtu
$350
-
$
$339
-
$
TOTAL IMPLEMENTED Savings:
$50,990
Cost:
$140,896
$36,260 659,288 $10,367 2,197 $3,674 89 $350 - $339 - $36,260
659,288
kWh
$10,367
2,197
kW-months/year
$3,674
89
MMBtu
$350
-
$
$339
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost