IAC Assessment: UF0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 1,525,000
Annual Production 45,000,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,463,934 28,473,059 kWh $0.05
Electricity Demand $568,049 96,283 kW-months/year $5.90
Electricity Fees $(-370,463) - $ -
Natural Gas $381,587 69,245 MMBtu $5.51
TOTAL ENERGY COSTS $2,043,107
RECOMMENDED SAVINGS* $331,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $331,342
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$128,693
Cost:
$34,812
- - - - $128,693 23,352 -
-
kWh
-
-
kW-months/year
$128,693
23,352
MMBtu
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$99,716
Cost:
$392,375
- - - - $99,716 18,094 -
-
kWh
-
-
kW-months/year
$99,716
18,094
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,477
Cost:
$20,256
$27,832 545,730 $7,645 1,296 - - $27,832
545,730
kWh
$7,645
1,296
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,246
Cost:
$1,280
$32,246 632,284 - - - - $32,246
632,284
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,996
Cost:
-
$16,996 324,075 - - - - $16,996
324,075
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$18,214
Cost:
$25,600
$18,214 357,139 - - - - $18,214
357,139
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$331,342
Cost:
$474,323
$95,288 1,859,228 $7,645 1,296 $228,409 41,446 $95,288
1,859,228
kWh
$7,645
1,296
kW-months/year
$228,409
41,446
MMBtu
TOTAL IMPLEMENTED Savings:
$331,342
Cost:
$474,323
$95,288 1,859,228 $7,645 1,296 $228,409 41,446 $95,288
1,859,228
kWh
$7,645
1,296
kW-months/year
$228,409
41,446
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas