IAC logo
IAC Assessment: UF0549
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0549
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Reclaimed Water and Bio-Solids
NAICS 221118 - Other Electric Power Generation
SIC 4939 - Combination Utilities, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 3,384,000
Annual Production 14,391,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,482,684 42,058,447 kWh $0.06
Electricity Demand $752,541 90,493 kW-months/year $8.32
Electricity Fees $80,533 - $ -
Natural Gas $25,570 8,597 MMBtu $2.97
Fuel Oil #1 $15,540 1,097 MMBtu $14.17
TOTAL ENERGY COSTS $3,356,868
RECOMMENDED SAVINGS* $1,308,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$737,260
Cost:
$2,600,000
$1,003,000 17,000,000 $199,584 24,000 $(-295,324) (-99,436) $(-170,000) - - - $1,003,000
17,000,000
kWh
$199,584
24,000
kW-months/year
$(-295,324)
(-99,436)
MMBtu
$(-170,000)
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$73,018
Cost:
$68,138
$54,885 930,251 $18,133 2,181 - - - - - - $54,885
930,251
kWh
$18,133
2,181
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,001
Cost:
$2,904
$4,484 76,000 $1,517 182 - - - - - - $4,484
76,000
kWh
$1,517
182
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$492,292
Cost:
$1,875,550
$(-6,461) (-109,500) $(-1,247) (-150) - - - - $500,000 - $(-6,461)
(-109,500)
kWh
$(-1,247)
(-150)
kW-months/year
-
-
MMBtu
-
-
$
$500,000
-
$
TOTAL RECOMMENDED Savings:
$1,308,571
Cost:
$4,546,592
$1,055,908 17,896,751 $217,987 26,213 $(-295,324) (-99,436) $(-170,000) - $500,000 - $1,055,908
17,896,751
kWh
$217,987
26,213
kW-months/year
$(-295,324)
(-99,436)
MMBtu
$(-170,000)
-
$
$500,000
-
$
TOTAL IMPLEMENTED Savings:
$6,001
Cost:
$2,904
$4,484 76,000 $1,517 182 - - - - - - $4,484
76,000
kWh
$1,517
182
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material