IAC logo
IAC Assessment: UF0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Concrete Septic Tanks
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 4,900,000
Annual Production 18,434 Tons
Production Hrs. Annual 2,860
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,241 191,497 kWh $0.07
Electricity Demand $6,744 603 kW-months/year $11.18
Electricity Fees $5,319 - $ -
Fuel Oil #2 $142,749 7,578 MMBtu $18.84
TOTAL ENERGY COSTS $169,053
RECOMMENDED SAVINGS* $423,317 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $423,317
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$70,950
Cost:
$336,000
- - - - $46,950 2,490 $24,000 - - - -
-
kWh
-
-
kW-months/year
$46,950
2,490
MMBtu
$24,000
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,846
Cost:
$7,217
$2,952 39,893 $4,894 438 - - - - - - $2,952
39,893
kWh
$4,894
438
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,700
Cost:
$10,047
$2,700 36,481 - - - - - - - - $2,700
36,481
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,821
Cost:
$3,900
$581 7,849 $1,240 111 - - - - - - $581
7,849
kWh
$1,240
111
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$340,000
Cost:
$5,859
- - - - - - - - $340,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$340,000
-
%
TOTAL RECOMMENDED Savings:
$423,317
Cost:
$363,023
$6,233 84,223 $6,134 548 $46,950 2,490 $24,000 - $340,000 - $6,233
84,223
kWh
$6,134
548
kW-months/year
$46,950
2,490
MMBtu
$24,000
-
$
$340,000
-
%
TOTAL IMPLEMENTED Savings:
$423,317
Cost:
$363,023
$6,233 84,223 $6,134 548 $46,950 2,490 $24,000 - $340,000 - $6,233
84,223
kWh
$6,134
548
kW-months/year
$46,950
2,490
MMBtu
$24,000
-
$
$340,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production