IAC logo
IAC Assessment: UF0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Medical Furnishing
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2599 - Furniture And Fixtures, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 80,000
Annual Production 31,890 Units
Production Hrs. Annual 3,134
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,471 642,415 kWh $0.07
Electricity Demand $26,652 3,796 kW-months/year $7.02
Electricity Fees $11,639 - $ -
Natural Gas $18,767 3,439 MMBtu $5.46
TOTAL ENERGY COSTS $101,529
RECOMMENDED SAVINGS* $78,204 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,128
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$42,076
Cost:
$359,360
$42,076 609,804 - - - - - - $42,076
609,804
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$19,566
Cost:
$32,210
$(-33) (-483) - - - - $19,599 - $(-33)
(-483)
kWh
-
-
kW-months/year
-
-
MMBtu
$19,599
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,767
Cost:
$956
$3,767 54,601 - - - - - - $3,767
54,601
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE Savings:
$3,003
Cost:
$750
- - - - $3,003 550 - - -
-
kWh
-
-
kW-months/year
$3,003
550
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,600
Cost:
$3,317
$1,476 21,395 $1,124 160 - - - - $1,476
21,395
kWh
$1,124
160
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,328
Cost:
$5,468
$956 13,852 $372 53 - - - - $956
13,852
kWh
$372
53
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$602
Cost:
-
$602 8,719 - - - - - - $602
8,719
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$5,262
Cost:
$7,180
$(-6) (-89) $(-192) (-27) - - $5,460 - $(-6)
(-89)
kWh
$(-192)
(-27)
kW-months/year
-
-
MMBtu
$5,460
-
$
TOTAL RECOMMENDED Savings:
$78,204
Cost:
$409,241
$48,838 707,799 $1,304 186 $3,003 550 $25,059 - $48,838
707,799
kWh
$1,304
186
kW-months/year
$3,003
550
MMBtu
$25,059
-
$
TOTAL IMPLEMENTED Savings:
$36,128
Cost:
$49,881
$6,762 97,995 $1,304 186 $3,003 550 $25,059 - $6,762
97,995
kWh
$1,304
186
kW-months/year
$3,003
550
MMBtu
$25,059
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product