IAC Assessment: UF0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2021
Principal Product Treated water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 12
Plant Area (Sq.Ft.) 15,000
Annual Production 1,860,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $408,004 8,644,800 kWh $0.05
Electricity Demand $104,997 16,254 kW-months/year $6.46
Electricity Fees $49,627 - $ -
Natural Gas $59,416 4,433 MMBtu $13.40
TOTAL ENERGY COSTS $622,044
RECOMMENDED SAVINGS* $746,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131,974
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $ $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$235,547
Cost:
$75,000
$148,224 3,153,693 $27,907 4,320 $59,416 4,433 - - - - - - - - - - $148,224
3,153,693
kWh
$27,907
4,320
kW-months/year
$59,416
4,433
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$74,329
Cost:
$45,478
$74,329 1,581,463 - - - - - - - - - - - - - - $74,329
1,581,463
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$52,001
Cost:
$14,132
$43,282 920,901 $8,719 1,350 - - - - - - - - - - - - $43,282
920,901
kWh
$8,719
1,350
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,376
Cost:
-
$2,015 42,872 - - - - $174 - - - $187 - - - - - $2,015
42,872
kWh
-
-
kW-months/year
-
-
MMBtu
$174
-
$
-
-
$
$187
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,115
Cost:
$4,140
$1,115 23,730 - - - - - - - - - - - - - - $1,115
23,730
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$378,782
Cost:
$1,857,200
$(-5,147) (-109,500) $(-969) (-150) - - - - $301,698 - - - - - $83,200 - $(-5,147)
(-109,500)
kWh
$(-969)
(-150)
kW-months/year
-
-
MMBtu
-
-
$
$301,698
-
$
-
-
$
-
-
$
$83,200
-
$
07: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$2,153
Cost:
-
- - - - - - - - - - - - $2,153 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$2,153
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$746,303
Cost:
$1,995,950
$263,818 5,613,159 $35,657 5,520 $59,416 4,433 $174 - $301,698 - $187 - $2,153 - $83,200 - $263,818
5,613,159
kWh
$35,657
5,520
kW-months/year
$59,416
4,433
MMBtu
$174
-
$
$301,698
-
$
$187
-
$
$2,153
-
$
$83,200
-
$
TOTAL IMPLEMENTED Savings:
$131,974
Cost:
$63,750
$120,741 2,568,966 $8,719 1,350 - - $174 - - - $187 - $2,153 - - - $120,741
2,568,966
kWh
$8,719
1,350
kW-months/year
-
-
MMBtu
$174
-
$
-
-
$
$187
-
$
$2,153
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production