IAC Assessment: UF0565
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0565
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 53,721
Annual Production 1,896,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $386,572 8,173,800 kWh $0.05
Electricity Demand $93,051 15,402 kW-months/year $6.04
Electricity Fees $47,361 - $ -
TOTAL ENERGY COSTS $526,984
RECOMMENDED SAVINGS* $746,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,351
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$124,268
Cost:
$90,000
$105,638 2,247,626 $18,630 3,084 - - - - - - - - $105,638
2,247,626
kWh
$18,630
3,084
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$120,536
Cost:
$84,600
$93,061 1,980,014 $27,475 4,548 - - - - - - - - $93,061
1,980,014
kWh
$27,475
4,548
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$52,797
Cost:
$9,223
$46,397 987,169 $6,400 1,059 - - - - - - - - $46,397
987,169
kWh
$6,400
1,059
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,569
Cost:
$48,945
$32,569 692,963 - - - - - - - - - - $32,569
692,963
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$29,289
Cost:
-
$29,289 623,165 - - - - - - - - - - $29,289
623,165
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,587
Cost:
$12,332
$2,587 55,041 - - - - - - - - - - $2,587
55,041
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,574
Cost:
-
$1,107 23,563 - - $225 - $242 - - - - - $1,107
23,563
kWh
-
-
kW-months/year
$225
-
$
$242
-
$
-
-
$
-
-
$
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$381,639
Cost:
$1,857,208
$(-5,147) (-109,500) $(-906) (-150) - - $304,492 - - - $83,200 - $(-5,147)
(-109,500)
kWh
$(-906)
(-150)
kW-months/year
-
-
$
$304,492
-
$
-
-
$
$83,200
-
$
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$1,621
Cost:
-
- - - - - - - - $1,621 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,621
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$746,880
Cost:
$2,102,308
$305,501 6,500,041 $51,599 8,541 $225 - $304,734 - $1,621 - $83,200 - $305,501
6,500,041
kWh
$51,599
8,541
kW-months/year
$225
-
$
$304,734
-
$
$1,621
-
$
$83,200
-
$
TOTAL IMPLEMENTED Savings:
$38,351
Cost:
$61,277
$36,263 771,567 - - $225 - $242 - $1,621 - - - $36,263
771,567
kWh
-
-
kW-months/year
$225
-
$
$242
-
$
$1,621
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product By-product Production