IAC Assessment: UF0568
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0568
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 344,000
Annual Production 2,100,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $346,135 5,866,700 kWh $0.06
Electricity Demand $91,836 15,306 kW-months/year $6.00
Electricity Fees $6,817 - $ -
TOTAL ENERGY COSTS $444,788
RECOMMENDED SAVINGS* $1,779,569 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,101
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$52,474
Cost:
$147,852
$41,127 697,073 $11,347 1,891 - - - - - - - - $41,127
697,073
kWh
$11,347
1,891
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$20,147
Cost:
$49,165
$20,147 341,473 - - - - - - - - - - $20,147
341,473
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,182
Cost:
$12,247
$8,997 152,496 $2,185 364 - - - - - - - - $8,997
152,496
kWh
$2,185
364
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$8,146
Cost:
$700
$8,146 138,060 - - - - - - - - - - $8,146
138,060
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,117
Cost:
$9,240
$3,117 52,838 - - - - - - - - - - $3,117
52,838
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$1,828
Cost:
-
$1,828 30,979 - - - - - - - - - - $1,828
30,979
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,670,260
Cost:
$53,000
$(-18,761) (-317,988) $(-2,614) (-436) $(-80,424) (-6,000) - - - - $1,772,059 - $(-18,761)
(-317,988)
kWh
$(-2,614)
(-436)
kW-months/year
$(-80,424)
(-6,000)
MMBtu
-
-
$
-
-
$
$1,772,059
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$8,760
Cost:
$8,000
- - - - - - $8,760 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,760
-
$
-
-
$
-
-
$
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$3,655
Cost:
-
- - - - - - - - $3,655 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,655
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,779,569
Cost:
$280,204
$64,601 1,094,931 $10,918 1,819 $(-80,424) (-6,000) $8,760 - $3,655 - $1,772,059 - $64,601
1,094,931
kWh
$10,918
1,819
kW-months/year
$(-80,424)
(-6,000)
MMBtu
$8,760
-
$
$3,655
-
$
$1,772,059
-
$
TOTAL IMPLEMENTED Savings:
$38,101
Cost:
$70,652
$32,261 546,807 $2,185 364 - - - - $3,655 - - - $32,261
546,807
kWh
$2,185
364
kW-months/year
-
-
MMBtu
-
-
$
$3,655
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product By-product Production