IAC Assessment: UF0569
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0569
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2021
Principal Product Newspapers and Other Publications
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 65,119
Annual Production 9,000,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $390,809 3,686,880 kWh $0.11
Electricity Demand $64,929 7,429 kW-months/year $8.74
Electricity Fees $15,104 - $ -
TOTAL ENERGY COSTS $470,842
RECOMMENDED SAVINGS* $104,934 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,494
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,828
Cost:
$23,023
$24,828 234,225 - - $24,828
234,225
kWh
-
-
kW-months/year
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$18,925
Cost:
$25,340
$18,925 178,538 - - $18,925
178,538
kWh
-
-
kW-months/year
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$16,113
Cost:
$14,830
$16,113 152,014 - - $16,113
152,014
kWh
-
-
kW-months/year
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,766
Cost:
$5,229
$11,399 107,540 $1,367 156 $11,399
107,540
kWh
$1,367
156
kW-months/year
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$11,660
Cost:
$40,000
$11,660 110,000 - - $11,660
110,000
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,252
Cost:
$1,985
$5,618 52,998 $634 73 $5,618
52,998
kWh
$634
73
kW-months/year
07: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$3,887
Cost:
-
$3,887 36,667 - - $3,887
36,667
kWh
-
-
kW-months/year
08: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$3,742
Cost:
$3,746
$3,742 35,300 - - $3,742
35,300
kWh
-
-
kW-months/year
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,071
Cost:
$495
$3,071 28,971 - - $3,071
28,971
kWh
-
-
kW-months/year
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,868
Cost:
-
$1,868 17,619 - - $1,868
17,619
kWh
-
-
kW-months/year
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,822
Cost:
-
$1,822 15,824 - - $1,822
15,824
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$104,934
Cost:
$114,648
$102,933 969,696 $2,001 229 $102,933
969,696
kWh
$2,001
229
kW-months/year
TOTAL IMPLEMENTED Savings:
$54,494
Cost:
$30,732
$52,493 493,844 $2,001 229 $52,493
493,844
kWh
$2,001
229
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand