IAC logo
IAC Assessment: UF0573
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0573
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 2,217,000
Annual Production 1,829,900 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $357,244 9,450,400 kWh $0.04
Electricity Demand $149,179 32,695 kW-months/year $4.56
Electricity Fees $16,107 - $ -
TOTAL ENERGY COSTS $522,530
RECOMMENDED SAVINGS* $674,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $674,666
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$223,605
Cost:
$552,197
$212,800 5,600,000 $43,805 9,600 $(-33,000) - - - - - $212,800
5,600,000
kWh
$43,805
9,600
kW-months/year
$(-33,000)
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$50,619
Cost:
$45,817
$37,592 989,267 $13,027 2,855 - - - - - - $37,592
989,267
kWh
$13,027
2,855
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$35,580
Cost:
$50,843
$25,138 661,528 $10,442 2,288 - - - - - - $25,138
661,528
kWh
$10,442
2,288
kW-months/year
-
-
$
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$324,658
Cost:
$1,232,000
$(-7,450) (-196,049) $(-1,225) (-269) - - - - $333,333 - $(-7,450)
(-196,049)
kWh
$(-1,225)
(-269)
kW-months/year
-
-
$
-
-
$
$333,333
-
$
05: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$35,912
Cost:
$10,000
$35,912 945,040 - - - - - - - - $35,912
945,040
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$4,292
Cost:
-
- - - - - - $4,292 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,292
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$674,666
Cost:
$1,890,857
$303,992 7,999,786 $66,049 14,475 $(-33,000) - $4,292 - $333,333 - $303,992
7,999,786
kWh
$66,049
14,475
kW-months/year
$(-33,000)
-
$
$4,292
-
$
$333,333
-
$
TOTAL IMPLEMENTED Savings:
$674,666
Cost:
$1,890,857
$303,992 7,999,786 $66,049 14,475 $(-33,000) - $4,292 - $333,333 - $303,992
7,999,786
kWh
$66,049
14,475
kW-months/year
$(-33,000)
-
$
$4,292
-
$
$333,333
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Primary Product