IAC Assessment: UF0575
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0575
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Lithium-ion Batteries
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 240,000
Annual Production 6,417 Units
Production Hrs. Annual 3,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $626,056 11,906,395 kWh $0.05
Electricity Demand $213,430 32,449 kW-months/year $6.58
Electricity Fees $127,411 - $ -
Natural Gas $238,445 30,910 MMBtu $7.71
TOTAL ENERGY COSTS $1,222,949
RECOMMENDED SAVINGS* $766,653 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $586,028
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$320,724
Cost:
$1,068,750
$450,500 8,500,000 $78,924 12,000 $(-123,700) (-18,808) $(-85,000) - - - $450,500
8,500,000
kWh
$78,924
12,000
kW-months/year
$(-123,700)
(-18,808)
MMBtu
$(-85,000)
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$175,432
Cost:
-
- - - - - - $175,432 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$175,432
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$59,112
Cost:
$64,054
$44,173 833,448 $14,939 2,271 - - - - - - $44,173
833,448
kWh
$14,939
2,271
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$5,193
Cost:
$12,000
$3,573 67,408 $1,620 246 - - - - - - $3,573
67,408
kWh
$1,620
246
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,361
Cost:
-
$3,361 63,410 - - - - - - - - $3,361
63,410
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,831
Cost:
$290
$2,831 53,414 - - - - - - - - $2,831
53,414
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$200,000
Cost:
-
- - - - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$200,000
-
$
TOTAL RECOMMENDED Savings:
$766,653
Cost:
$1,145,094
$504,438 9,517,680 $95,483 14,518 $(-123,700) (-18,808) $90,432 - $200,000 - $504,438
9,517,680
kWh
$95,483
14,518
kW-months/year
$(-123,700)
(-18,808)
MMBtu
$90,432
-
$
$200,000
-
$
TOTAL IMPLEMENTED Savings:
$586,028
Cost:
$1,133,094
$500,865 9,450,272 $93,863 14,271 $(-123,700) (-18,808) $(-85,000) - $200,000 - $500,865
9,450,272
kWh
$93,863
14,271
kW-months/year
$(-123,700)
(-18,808)
MMBtu
$(-85,000)
-
$
$200,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material