IAC Assessment: UF0575
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UF0575
IAC Center University of Florida
Assessment Year 2022
Principal Product Lithium-ion Batteries
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 240,000
Annual Production 6,417 Units
Production Hrs. Annual 3,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $626,056 11,906,395 kWh $0.05
Electricity Demand $213,430 32,449 kW-months/year $6.58
Electricity Fees $127,411 - $ -
Natural Gas $238,445 30,910 MMBtu $7.71
TOTAL ENERGY COSTS $1,222,949
RECOMMENDED SAVINGS* $766,653 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$320,724
Cost:
$1,068,750
$450,500 8,500,000 $78,924 12,000 $(-123,700) (-18,808) $(-85,000) - - - $450,500
8,500,000
kWh
$78,924
12,000
kW-months/year
$(-123,700)
(-18,808)
MMBtu
$(-85,000)
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$175,432
Cost:
-
- - - - - - $175,432 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$175,432
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$59,112
Cost:
$64,054
$44,173 833,448 $14,939 2,271 - - - - - - $44,173
833,448
kWh
$14,939
2,271
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$5,193
Cost:
$12,000
$3,573 67,408 $1,620 246 - - - - - - $3,573
67,408
kWh
$1,620
246
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,361
Cost:
-
$3,361 63,410 - - - - - - - - $3,361
63,410
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,831
Cost:
$290
$2,831 53,414 - - - - - - - - $2,831
53,414
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$200,000
Cost:
-
- - - - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$200,000
-
$
TOTAL RECOMMENDED Savings:
$766,653
Cost:
$1,145,094
$504,438 9,517,680 $95,483 14,518 $(-123,700) (-18,808) $90,432 - $200,000 - $504,438
9,517,680
kWh
$95,483
14,518
kW-months/year
$(-123,700)
(-18,808)
MMBtu
$90,432
-
$
$200,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material