IAC logo
IAC Assessment: UF0578
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0578
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Avionics Systems
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 125,455
Annual Production 50,000 Units
Production Hrs. Annual 2,496
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,891 2,182,500 kWh $0.08
Electricity Demand $58,229 7,710 kW-months/year $7.55
Electricity Fees $39,671 - $ -
TOTAL ENERGY COSTS $266,791
RECOMMENDED SAVINGS* $59,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,815
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$15,842
Cost:
$11,742
$11,764 152,775 $4,078 540 $11,764
152,775
kWh
$4,078
540
kW-months/year
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$12,457
Cost:
$4,590
$10,978 142,572 $1,479 196 $10,978
142,572
kWh
$1,479
196
kW-months/year
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,829
Cost:
$2,419
$9,829 127,650 - - $9,829
127,650
kWh
-
-
kW-months/year
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,565
Cost:
$25,400
$8,565 111,241 - - $8,565
111,241
kWh
-
-
kW-months/year
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$7,688
Cost:
-
$7,688 99,845 - - $7,688
99,845
kWh
-
-
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,461
Cost:
$390
$2,461 31,959 - - $2,461
31,959
kWh
-
-
kW-months/year
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,930
Cost:
-
$1,930 25,070 - - $1,930
25,070
kWh
-
-
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,065
Cost:
$1,710
$1,065 13,826 - - $1,065
13,826
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$59,837
Cost:
$46,251
$54,280 704,938 $5,557 736 $54,280
704,938
kWh
$5,557
736
kW-months/year
TOTAL IMPLEMENTED Savings:
$38,815
Cost:
$16,261
$34,737 451,125 $4,078 540 $34,737
451,125
kWh
$4,078
540
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand