IAC Assessment: UF0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 35
Plant Area (Sq.Ft.) 105,895
Annual Production 59,342 Tons
Production Hrs. Annual 6,460
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $480,606 8,296,400 kWh $0.06
Electricity Demand $206,348 14,454 kW-months/year $14.28
Electricity Fees $19,148 - $ -
Natural Gas $72,270 37,757 MMBtu $1.91
TOTAL ENERGY COSTS $787,064
RECOMMENDED SAVINGS* $601,872 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $139,856
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$460,292
Cost:
$1,330,000
$406,000 7,000,000 $171,312 12,000 $(-88,816) (-46,403) - - $(-28,204) - - - $406,000
7,000,000
kWh
$171,312
12,000
kW-months/year
$(-88,816)
(-46,403)
MMBtu
-
-
$
$(-28,204)
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$48,128
Cost:
$44,635
$33,683 580,748 $14,445 1,012 - - - - - - - - $33,683
580,748
kWh
$14,445
1,012
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,481
Cost:
$66,747
$45,481 784,159 - - - - - - - - - - $45,481
784,159
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$27,896
Cost:
$8,591
$17,941 309,321 $9,955 697 - - - - - - - - $17,941
309,321
kWh
$9,955
697
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$12,470
Cost:
$19,320
$12,470 215,000 - - - - - - - - - - $12,470
215,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.8117 INSTALL SUB-METERING EQUIPMENT Savings:
$2,168
Cost:
$8,880
- - - - $2,168 1,133 - - - - - - -
-
kWh
-
-
kW-months/year
$2,168
1,133
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,713
Cost:
-
$3,245 55,947 - - - - $220 - - - $248 - $3,245
55,947
kWh
-
-
kW-months/year
-
-
MMBtu
$220
-
$
-
-
$
$248
-
$
08: 2.1222 INSTALL TURBULATORS Savings:
$1,724
Cost:
$7,500
- - - - $1,724 901 - - - - - - -
-
kWh
-
-
kW-months/year
$1,724
901
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$601,872
Cost:
$1,485,673
$518,820 8,945,175 $195,712 13,709 $(-84,924) (-44,370) $220 - $(-28,204) - $248 - $518,820
8,945,175
kWh
$195,712
13,709
kW-months/year
$(-84,924)
(-44,370)
MMBtu
$220
-
$
$(-28,204)
-
$
$248
-
$
TOTAL IMPLEMENTED Savings:
$139,856
Cost:
$148,173
$112,820 1,945,175 $24,400 1,709 $2,168 1,133 $220 - - - $248 - $112,820
1,945,175
kWh
$24,400
1,709
kW-months/year
$2,168
1,133
MMBtu
$220
-
$
-
-
$
$248
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost