IAC logo
IAC Assessment: UF0593
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0593
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Surgical & Medical Instruments
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 420
Plant Area (Sq.Ft.) 258,000
Annual Production 55,000,000 Units
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,221,190 17,125,093 kWh $0.07
Electricity Demand $360,943 89,823 kW-months/year $4.02
Electricity Fees $89,347 - $ -
TOTAL ENERGY COSTS $1,923,856
RECOMMENDED SAVINGS* $656,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $630,342
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$131,807
Cost:
$215,600
$44,182 622,282 - - - - $87,625 - - - $44,182
622,282
kWh
-
-
kW-months/year
-
-
$
$87,625
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$110,377
Cost:
$92,132
$85,112 1,198,757 $25,265 6,288 - - - - - - $85,112
1,198,757
kWh
$25,265
6,288
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$97,641
Cost:
$400,000
$87,713 1,235,400 $9,928 2,471 - - - - - - $87,713
1,235,400
kWh
$9,928
2,471
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$64,641
Cost:
$136,253
$59,583 839,200 $5,058 1,259 - - - - - - $59,583
839,200
kWh
$5,058
1,259
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$62,208
Cost:
$25,500
$62,208 876,167 - - - - - - - - $62,208
876,167
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$25,827
Cost:
$58,363
$(-2,485) (-35,000) $(-1,688) (-420) - - $30,000 - - - $(-2,485)
(-35,000)
kWh
$(-1,688)
(-420)
kW-months/year
-
-
$
$30,000
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,604
Cost:
-
$4,452 62,708 - - $588 - - - $564 - $4,452
62,708
kWh
-
-
kW-months/year
$588
-
$
-
-
$
$564
-
$
08: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$121,588
Cost:
$12,000
$121,588 1,712,509 - - - - - - - - $121,588
1,712,509
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
09: 4.664 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA Savings:
$36,476
Cost:
$11,225
$36,476 513,753 - - - - - - - - $36,476
513,753
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$656,169
Cost:
$951,073
$498,829 7,025,776 $38,563 9,598 $588 - $117,625 - $564 - $498,829
7,025,776
kWh
$38,563
9,598
kW-months/year
$588
-
$
$117,625
-
$
$564
-
$
TOTAL IMPLEMENTED Savings:
$630,342
Cost:
$892,710
$501,314 7,060,776 $40,251 10,018 $588 - $87,625 - $564 - $501,314
7,060,776
kWh
$40,251
10,018
kW-months/year
$588
-
$
$87,625
-
$
$564
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost