Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2023 |
Principal Product | Aluminum Extruded Products |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 1,508,293 |
Annual Production | 53,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,074,944 | 26,250,000 | kWh | $0.08 |
Electricity Demand | $1 | 51,301 | kW-months/year | $0.00 |
Electricity Fees | $71,982 | - | $ | - |
Natural Gas | $2,663,210 | 870,170 | MMBtu | $3.06 |
TOTAL ENERGY COSTS | $4,873,264 | |||
RECOMMENDED SAVINGS* | $2,571,192 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,024,753 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $1,546,439 Cost: $3,990,000 |
$2,014,500 | 25,500,000 | $(-456,558) | (-149,153) | - | - | $(-11,503) | - |
$2,014,500 25,500,000 kWh |
$(-456,558) (-149,153) MMBtu |
- - $ |
$(-11,503) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8117 INSTALL SUB-METERING EQUIPMENT |
Savings: $266,539 Cost: $15,232 |
- | - | $266,539 | 87,017 | - | - | - | - |
- - kWh |
$266,539 87,017 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $232,670 Cost: $300,000 |
- | - | $232,670 | 76,011 | - | - | - | - |
- - kWh |
$232,670 76,011 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $213,087 Cost: - |
- | - | $213,087 | 69,614 | - | - | - | - |
- - kWh |
$213,087 69,614 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $145,162 Cost: $141,225 |
$145,162 | 1,837,500 | - | - | - | - | - | - |
$145,162 1,837,500 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $50,904 Cost: $49,563 |
$50,904 | 644,356 | - | - | - | - | - | - |
$50,904 644,356 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $47,000 Cost: $171,903 |
$47,000 | 594,934 | - | - | - | - | - | - |
$47,000 594,934 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $27,499 Cost: $1,399 |
$27,499 | 348,084 | - | - | - | - | - | - |
$27,499 348,084 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $12,289 Cost: $25,440 |
$12,289 | 155,554 | - | - | - | - | - | - |
$12,289 155,554 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $26,447 Cost: $4,768 |
$(-7,187) | (-90,979) | - | - | $33,634 | - | - | - |
$(-7,187) (-90,979) kWh |
- - MMBtu |
$33,634 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $3,156 Cost: $2,352 |
- | - | - | - | - | - | $3,156 | - |
- - kWh |
- - MMBtu |
- - $ |
$3,156 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,571,192 Cost: $4,701,882 |
$2,290,167 | 28,989,449 | $255,738 | 83,489 | $33,634 | - | $(-8,347) | - | $2,290,167 28,989,449 kWh |
$255,738 83,489 MMBtu |
$33,634 - $ |
$(-8,347) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,024,753 Cost: $711,882 |
$275,667 | 3,489,449 | $712,296 | 232,642 | $33,634 | - | $3,156 | - | $275,667 3,489,449 kWh |
$712,296 232,642 MMBtu |
$33,634 - $ |
$3,156 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes |