IAC Assessment: UF0600
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Joint Treatment Compound
NAICS 327420 - Gypsum Product Manufacturing
SIC 3275 - Gypsum Products
Sales $50,000,000-$100,000,000
# of Employees 32
Plant Area (Sq.Ft.) 81,225
Annual Production 18,200 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,768 2,109,234 kWh $0.08
Electricity Demand $64,604 24,531 kW-months/year $2.63
Electricity Fees $48,315 - $ -
TOTAL ENERGY COSTS $274,687
RECOMMENDED SAVINGS* $82,982 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$20,830
Cost:
$11,347
$16,241 210,923 $4,589 1,742 - - $16,241
210,923
kWh
$4,589
1,742
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,863
Cost:
$38,735
$14,822 192,492 $3,041 1,154 - - $14,822
192,492
kWh
$3,041
1,154
kW-months/year
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$4,976
Cost:
$11,866
$4,976 64,622 - - - - $4,976
64,622
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,508
Cost:
$584
$4,508 58,548 - - - - $4,508
58,548
kWh
-
-
kW-months/year
-
-
$
05: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$1,132
Cost:
$1,440
$1,132 14,700 - - - - $1,132
14,700
kWh
-
-
kW-months/year
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,118
Cost:
$591
$1,118 14,515 - - - - $1,118
14,515
kWh
-
-
kW-months/year
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$32,555
Cost:
$3,179
$(-321) (-4,165) $(-111) (-42) $32,987 - $(-321)
(-4,165)
kWh
$(-111)
(-42)
kW-months/year
$32,987
-
$
TOTAL RECOMMENDED Savings:
$82,982
Cost:
$67,742
$42,476 551,635 $7,519 2,855 $32,987 - $42,476
551,635
kWh
$7,519
2,855
kW-months/year
$32,987
-
$
TOTAL IMPLEMENTED Savings:
$62,152
Cost:
$56,395
$26,235 340,712 $2,930 1,112 $32,987 - $26,235
340,712
kWh
$2,930
1,112
kW-months/year
$32,987
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes